View Single Post
Old 10-31-10, 05:40 PM
  #9  
Road Fan
Senior Member
 
Road Fan's Avatar
 
Join Date: Apr 2005
Location: Ann Arbor, MI
Posts: 16,874

Bikes: 1980 Masi, 1984 Mondonico, 1984 Trek 610, 1980 Woodrup Giro, 2005 Mondonico Futura Leggera ELOS, 1967 PX10E, 1971 Peugeot UO-8

Mentioned: 49 Post(s)
Tagged: 0 Thread(s)
Quoted: 1856 Post(s)
Liked 664 Times in 506 Posts
I have a two stage Craftsman, 9 hp, 26", self-propelled, electric start, with a light. It lets me clear our double, 50' driveway in about 20 minutes. Best thing is, after the City plows the street and creates a 2 to 3 foot icy berm across the driveways, I can clear that in about another 20 minutes. THAT takes about an hour by hand, on a good day!

It clears down to about a 1/4 inch height, but at that height the sun can evaporate the rest.
Road Fan is offline