View Single Post
Old 04-22-11, 10:03 AM
  #132  
mudboy
Senior Member
 
mudboy's Avatar
 
Join Date: Sep 2008
Location: Collegeville, PA
Posts: 1,350

Bikes: Ruckelshaus Randonneur, Specialized Allez (early 90's, steel), Ruckelshaus Path Bomber currently being built

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Likes: 0
Liked 1 Time in 1 Post
Originally Posted by guywithchickens
I used the jig ideas from Talbot's book. Worked out pretty well. The downside of a first frame is that it took about 5 months of on-and-off work...lots of thinking and measuring. I think a second frame would go much faster.
I just finished my second (see above). It does go much faster.
mudboy is offline