View Single Post
Old 06-17-14, 10:16 AM
  #28  
howsteepisit
Senior Member
 
howsteepisit's Avatar
 
Join Date: Oct 2005
Location: Eugene, OR
Posts: 4,336

Bikes: Canyon Endurace SLX 8Di2

Mentioned: 4 Post(s)
Tagged: 0 Thread(s)
Quoted: 510 Post(s)
Liked 30 Times in 14 Posts
MAybe the VDOT should have their contractors ride a bike to their work station at the bridge.
howsteepisit is offline