View Single Post
Old 12-27-07, 06:59 PM
  #12  
jimisnowhere
Senior Member
 
jimisnowhere's Avatar
 
Join Date: Aug 2006
Location: Lynn, MA
Posts: 472

Bikes: 60's lowrider, 80's Cavaletto Centurion, 94 Specialized Rockhopper sport

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
The Greenway's done, its nice. Building a bike path down it would be nothing more than a glorified sidewalk though, there are maybe 6 or 7 roads that cut across the Greenway, all of which existed under the elevated artery before.The road that runs over the big dig is nice for riding, considering the proximity to downtown and major highways. The skate park has land reserved for it, but its up to itself to get funding. I think its called charlesriverskatepark.org. The cost is stupidly high. I know of people who made thousands a week leaning on shovels 36 hours a weekend. Noone was in control of anything from the highest CEO to the smallest managers, if smoeone felt like doing stuff, he did, if he didn't, the check still cleared.
jimisnowhere is offline