View Single Post
Old 07-25-09, 06:43 PM
  #18  
yeamac 
Parttime Member
 
yeamac's Avatar
 
Join Date: Nov 2006
Location: Central IL
Posts: 1,104

Bikes: 2021 Cannondale Topstone Neo SL, 2021 Tesoro Neo SL EQ, 2012 Marin Bridgeway City; 1996 Cannondale MT1000 tandem

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 19 Post(s)
Liked 17 Times in 9 Posts
Originally Posted by aggarcia
Have they fixed the path from 610 to Stella Link?
I was out on the path this morning and rode up to Stella Link. The trail is complete west of Stella Link, but now they are working on the path east of there.

Anyone know who to contact about this resurfacing? It is unfortunate that the part between Stella Link and the railroad tracks is significantly narrower than it used to be. Makes passing in certain situations not possible now. Although the smooth riding surface sure is nice.
yeamac is offline