Bikeforums.net is a forum about nothing but bikes. Our community can help you find information about hard-to-find and localized information like bicycle tours, specialties like where in your area to have your recumbent bike serviced, or what are the best bicycle tires and seats for the activities you use your bike for.




View Full Version : Belt Parkway Construction


Lightingguy
12-11-09, 03:41 PM
For anyone who's driven the Belt along Jamaica Bay in the past 2 weeks:

Big time construction project, replacing the Fresh Creek, Paerdegat, Mill Basin and Gerritson bridges, among others.

All have the bike path on top, all will have the bike lanes operational during construction, according to the information in the NYC Adobe document. All of these bridges get new bike/pedestrian lanes as well.

Construction plan is for completion in 2014'ish with landscaping till 2016.

Currently they are cutting down trees and it appears they will be installing temporary bridging alongside existing, while they demo and replace existing, thus lot's of construction and debris, so expect a mess and possible limited bike access for a bit.

www.nyc.gov/html/dot/downloads/pdf/beltpkwybrgs_eng.pdf

Steve B.


Papa Tom
12-11-09, 05:40 PM
Thanks for this report, Steve. I always wondered when and if those bridges - and their treacherous bike sidewalks - would be replaced.

Any repair work done at the beach yet?

Lightingguy
12-11-09, 07:28 PM
Any repair work done at the beach yet?

No idea, as it's not part of my driving commute and too damned cold for the bike !.

SB


Scorer75
12-16-09, 08:22 AM
Was wondering what they were up to, thanks for the link.