Framebuilders - Cold welding a CF tube?

Bikeforums.net is a forum about nothing but bikes. Our community can help you find information about hard-to-find and localized information like bicycle tours, specialties like where in your area to have your recumbent bike serviced, or what are the best bicycle tires and seats for the activities you use your bike for.
Can this threatening separation of FD braze-on on a CF tube be fixed?
It is still holding, but I expect it to break sooner or later. Should I wait for it to break or maybe try to squeeze some JBweld into the crack (and pray like hell?)
228941
If it were my bike, I would:
Drill out the rivets
Find an appropriate epoxy
Prep mating surfaces
Apply epoxy
Re-rivet
If it wasn't my bike, I would consult the manufacturer and see if it's covered under warranty.
If it were my bike, I would:
Drill out the rivets
Find an appropriate epoxy
Prep mating surfaces
Apply epoxy
Re-rivet
Thanks, that looks like sound advice.
I also think that two in line rivets only is not adequate for the leverage the cable pull has. The better braze-ons I see have four rivets in a square pattern, but I am afraid the bracket is too small for that.
PS.: Come to think of it, it should be possible to buy a boss that can accommodate more than two rivets, shouldn't it? Do you know a source where I could get one?
Powered by vBulletin® Version 4.1.12 Copyright © 2013 vBulletin Solutions, Inc. All rights reserved.