Cycling and bicycle discussion forums. 
   Click here to join our community Log in to access your Control Panel  


Go Back   > >

Foo Off-Topic chit chat with no general subject.

User Tag List

Closed Thread
 
Thread Tools Search this Thread
Old 12-20-04, 11:26 AM   #1
LordOpie
Senior Member
Thread Starter
 
LordOpie's Avatar
 
Join Date: Jun 2004
Location: Denver
Bikes: 2006 custom Walt Works roadie, 2003 Fuji Finest (road), 2002 Giant Iguana (mtb), 1986 BMW K75 (motor)
Posts: 3,698
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Time Impact Road Pedal $80 !!

http://www.performancebike.com/shop/...&estore_ID=113


I'm not advocating the pedal since I've never tried it, but that seems like an insane price. Heck, my ultegras cost $90.
LordOpie is offline  
Old 12-20-04, 11:30 AM   #2
Grasschopper
He drop me
 
Grasschopper's Avatar
 
Join Date: Jul 2004
Location: Central PA
Bikes: '03 Marin Mill Valley, '06 Cannondale Rush, '02 Eddy Merckx Corsa 0.1, '07 Bottecchia Euro Sprint Tour Comp Elite Pro 1000
Posts: 11,433
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Hmm a bit sketchy on the specs they have there. Given the retail price they have those would be the Impact Mag but they are listing them just as the Impact and the weight they give of 260g for the pair would be from the Time literature for the Impact Mag/Ti. May have to call to confirm which pedals these actually are.

Also the reason they are so cheap is that Time totally redesigned the pedals for 05 and this is the old pedal.

Edit: Consider this from Performance
Impact Mag
Impact S
Impact

So the weekly special says Impact with a photo which is different than any of the others and the specs from the Mag (which are wrong BTW as the 260g weight is form the Mag/Ti). I would call for sure before I ordered.
__________________
The views expressed by this poster do not reflect the views of BikeForums.net.

Last edited by Grasschopper; 12-20-04 at 11:37 AM.
Grasschopper is offline  
Old 12-20-04, 02:13 PM   #3
Bruced
Junior Member
 
Join Date: Nov 2004
Bikes:
Posts: 14
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
I just called and the tech was pretty useless. He just said it was probably a six-month old model. I was confused by the photo and limited description. I wanted to order but am still skeptical that it could be the aluminum model.
Bruced is offline  
Old 12-21-04, 07:09 PM   #4
Grasschopper
He drop me
 
Grasschopper's Avatar
 
Join Date: Jul 2004
Location: Central PA
Bikes: '03 Marin Mill Valley, '06 Cannondale Rush, '02 Eddy Merckx Corsa 0.1, '07 Bottecchia Euro Sprint Tour Comp Elite Pro 1000
Posts: 11,433
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
I have an update on this deal. I wrote Performance CS an email and sent it yesterday. Today more than 28 hours after I sent that email I got a reply saying that they have forwarded the question on to their technical support and that I would be getting an email from them. That was 2 hours before I left work today and as of my leaving there was no email back from Technical support so I replied to CS and asked if there was any chance I was going to get an answer to this question before the sale ended. I got no response.

You know I like Performance but this is a bit stupid.
__________________
The views expressed by this poster do not reflect the views of BikeForums.net.
Grasschopper is offline  
Old 12-22-04, 09:33 AM   #5
Ebbtide
Senior Member
 
Ebbtide's Avatar
 
Join Date: May 2003
Location: Ohio's Cycling Capital, America's North Coast.
Bikes:
Posts: 4,617
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
I've been watch this thread (nice pedals). I'm going to order now, if they are not what I want I'll send them back...ot keep them for a differernt bike.
Ebbtide is offline  
Old 12-22-04, 09:43 AM   #6
JBBOOKS
Senior Member
 
Join Date: Aug 2004
Bikes:
Posts: 233
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Performance's CS isn't that great. Their shipping sucks if you don't upgrade.
JBBOOKS is offline  
Closed Thread


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -6. The time now is 05:11 PM.