Benica Bridge MUP completion date: Anybody know?
#1
Member
Thread Starter
Join Date: Aug 2008
Posts: 36
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Benica Bridge MUP completion date: Anybody know?
I was going over the Benicia Bridge and saw them working on it. If anyone has info on the new bike lane please post. Thanks
#2
Senior Member
Join Date: Jan 2005
Location: Bay Area CA
Posts: 1,080
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
**The bicycle/pedestrian lane and the new south bound realignment will open in October 2009**
https://letmegooglethatforyou.com/?q=...idge+bike+lane
https://letmegooglethatforyou.com/?q=...idge+bike+lane
#3
Newbie
Join Date: Aug 2007
Location: Bay Point
Posts: 3
Bikes: fuji Professional
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
i saw last saturday 1 cyslist crossing the bridge from benicia to martinez, i will check that out wednesday.
#4
Senior Member
Join Date: Nov 2008
Location: Bay Area, Calif.
Posts: 7,239
Mentioned: 13 Post(s)
Tagged: 0 Thread(s)
Quoted: 659 Post(s)
Likes: 0
Liked 7 Times
in
6 Posts
The official opening ceremony has been scheduled for Saturday, August 29th at 10am on the Benicia side. Cyclists will be able to ride to the ceremony from Martinez starting at 9 am.
Some cyclists have already ridden across the bridge, but the last I heard the construction was not yet complete. Construction equipment was located on the path, some of the expansion joint areas were not covered and could be a hazard, and the railing on the edge of the bridge was not fully installed.
Some cyclists have already ridden across the bridge, but the last I heard the construction was not yet complete. Construction equipment was located on the path, some of the expansion joint areas were not covered and could be a hazard, and the railing on the edge of the bridge was not fully installed.