Advertise on Bikeforums.net



User Tag List

Results 1 to 5 of 5
  1. #1
    Senior Member
    Join Date
    Sep 2007
    Location
    Seattle
    My Bikes
    Litespeed, O'Brien, Specialized, Fuji
    Posts
    254
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Bellevue - route over 520 at 92nd Ave NE?

    I haven't been through here since some major highway construction. Just would like to know if I can still ride Points Dr. and over the 92nd Ave NE bridge going from Kirkland to Bellevue? I'm worried it may be gone, or not open to bikes.

    My alternate route is going by the Burgermaster to 112th NE.

  2. #2
    Squeaky Wheel woodway's Avatar
    Join Date
    Nov 2008
    Location
    Woodinville, WA
    Posts
    1,302
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    No idea about 92nd Ave NE, but 112th Ave NE is open to southbound traffic only through August.

    http://www.wsdot.wa.gov/NR/rdonlyres...urcombined.pdf

  3. #3
    Senior Member
    Join Date
    Sep 2007
    Location
    Seattle
    My Bikes
    Litespeed, O'Brien, Specialized, Fuji
    Posts
    254
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Hmm, good to know, thanks!

  4. #4
    Senior Member
    Join Date
    Feb 2008
    Location
    Western Washington
    Posts
    473
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    The 92nd overpass/bridge is still there, at least as of July 9, when I last rode it.

    Make sure you have good rubber for Points Drive going uphill from Yarrow Bay, as it is now crushed rock, not pavement.

  5. #5
    Senior Member
    Join Date
    Sep 2007
    Location
    Seattle
    My Bikes
    Litespeed, O'Brien, Specialized, Fuji
    Posts
    254
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Eek, it used to be such a nice road...

    WSDOT has some info on construction status and webcams including 92nd-
    http://www.wsdot.wa.gov/Projects/SR5...nstruction.htm

    It says there should be flaggers on the bridge thru Aug 2. They're building a big lid; there was apparently big nighttime work July 15-19 moving girders there, and more night work for another 6 weeks.

    I didn't see much info on bike specific closures, past or present. Travel through there should be interesting in any event for the near future.
    Last edited by Litespeedlouie; 08-01-13 at 12:43 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •