Go Back  Bike Forums > Bike Forums > Framebuilders
Reload this Page >

How Many Hours to Build a Frame?

Search
Notices
Framebuilders Thinking about a custom frame? Lugged vs Fillet Brazed. Different Frame materials? Newvex or Pacenti Lugs? why get a custom Road, Mountain, or Track Frame? Got a question about framebuilding? Lets discuss framebuilding at it's finest.

How Many Hours to Build a Frame?

Thread Tools
 
Search this Thread
 
Old 01-25-07, 09:20 AM
  #1  
Tiocfáidh ár Lá
Thread Starter
 
jfmckenna's Avatar
 
Join Date: Dec 2003
Location: The edge of b#
Posts: 5,475

Bikes: A whole bunch-a bikes.

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 460 Post(s)
Liked 123 Times in 76 Posts
How Many Hours to Build a Frame?

Just curious experienced frame builders. How many hours does it take for you to build a frame? Let's say a steel road frame for example, lugs or no lugs from the time you select the tubes to the time the paint is done drying.
jfmckenna is offline  
Old 01-25-07, 10:51 AM
  #2  
Banned.
 
Nessism's Avatar
 
Join Date: Jun 2004
Location: Torrance, CA
Posts: 3,061

Bikes: Homebuilt steel

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 2193 Post(s)
Liked 425 Times in 337 Posts
According to a discussion from the framebuilders list, an experienced builder with a full bevy of dedicated machinery can get the metal work down to as little as 8 hours for a custom TIG’ed frame. More traditional building methods, such as using lugs and brazed dropouts, push the time to about double that. Add some detail work and the time becomes…? Figure on about 2+ hours for a basic paint job.
Nessism is offline  
Old 01-25-07, 05:46 PM
  #3  
Banned
 
Join Date: Aug 2005
Posts: 5,115
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 2 Times in 1 Post
https://anvilbikes.com/?news_ID=14&catID=3
NoReg is offline  
Old 01-25-07, 11:40 PM
  #4  
Senior Member
 
Join Date: Nov 2005
Posts: 62
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Originally Posted by jfmckenna
Just curious experienced frame builders. How many hours does it take for you to build a frame? Let's say a steel road frame for example, lugs or no lugs from the time you select the tubes to the time the paint is done drying.
I have one 100+ hour lugged frame, yet to see a torch. Fortunately, it's not a customer's or i'd loose my shirt.
PuttPutt is offline  
Old 01-26-07, 04:31 PM
  #5  
Senior Member
 
zonatandem's Avatar
 
Join Date: Dec 2003
Location: Tucson, AZ
Posts: 11,016

Bikes: Custom Zona c/f tandem + Scott Plasma single

Mentioned: 3 Post(s)
Tagged: 1 Thread(s)
Quoted: 77 Post(s)
Likes: 0
Liked 19 Times in 11 Posts
Depends on experience of the builder. Depends on the complexity of the design.
Had a custom tandem built with mixed diameter tubing and handmade lugs. The lugs alone took 40 hours.
zonatandem is offline  
Old 01-28-07, 11:58 AM
  #6  
Tiocfáidh ár Lá
Thread Starter
 
jfmckenna's Avatar
 
Join Date: Dec 2003
Location: The edge of b#
Posts: 5,475

Bikes: A whole bunch-a bikes.

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 460 Post(s)
Liked 123 Times in 76 Posts
Interesting. Thanks...
jfmckenna is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.