Cycling and bicycle discussion forums. 
   Click here to join our community Log in to access your Control Panel  


Go Back   > > >

Southeast Alabama | Arkansas | Florida | Georgia | Kentucky | Louisiana | Mississippi | North Carolina | South Carolina | Tennessee | Virginia

User Tag List

Reply
 
Thread Tools Search this Thread
Old 08-05-09, 06:43 PM   #1
Stoop
Junior Member
Thread Starter
 
Join Date: Jul 2009
Bikes:
Posts: 13
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Brevard, flagler, volusia and others trail

http://www.miamiherald.com/news/flor...y/1170398.html

Looks like north central florida might finally get a decent bike trail, we will see what happens
Stoop is offline   Reply With Quote
Old 08-05-09, 06:46 PM   #2
jaxgtr
Senior Member
 
jaxgtr's Avatar
 
Join Date: Jul 2006
Location: Jacksonville, FL
Bikes: Trek ALR 6, Trek CrossRip, Trek X-Caliber 8
Posts: 4,354
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Yea this has been around a while. Would be nice if they can link up to Duval County as well. It's suppose to run down the beach and back up the St. John's river in a 260 mile loop.
__________________
Brian | 2015 Trek Emonda ALR 6 | 2015 Trek X-Caliber 8 | 2014 Trek CrossRip Comp
Quote:
Originally Posted by AEO View Post
you should learn to embrace change, and mock it's failings every step of the way.
jaxgtr is offline   Reply With Quote
Old 08-07-09, 08:39 AM   #3
zzOtherlandzz
Senior Member
 
Join Date: Apr 2009
Location: Near Palatka Florida
Bikes: 2011 Rocky Mountain Vertex 29'r, 2007 Trek 1500 -- 2003 Gary Fisher Tassajara -- 2006 Gary Fisher Tassajara Disc (converted to touring bike)
Posts: 1,246
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
I wonder if that plan is part of the one that includes a trail from East Palatka to St. Augustine along the old railroad tracks that goes through Hastings from Palatka. There were plans to convert the old RR tracks (tracks are already gone) that run along side State Road 100 west of Palatka to Keystone Heights and beyond. I know up towards Keystone some of it is already paved, 4 or 5 miles I think. I used to ride my mountain bike along the old tracks on SR. 100, they used to keep it cut, not really cleared but cut. Last time I checked they were not even doing that.
zzOtherlandzz is offline   Reply With Quote
Old 08-07-09, 10:39 PM   #4
jaxgtr
Senior Member
 
jaxgtr's Avatar
 
Join Date: Jul 2006
Location: Jacksonville, FL
Bikes: Trek ALR 6, Trek CrossRip, Trek X-Caliber 8
Posts: 4,354
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Yep, that is the one. They are suppose to link to some side trails as well.
__________________
Brian | 2015 Trek Emonda ALR 6 | 2015 Trek X-Caliber 8 | 2014 Trek CrossRip Comp
Quote:
Originally Posted by AEO View Post
you should learn to embrace change, and mock it's failings every step of the way.
jaxgtr is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -6. The time now is 05:03 AM.