Advertise on Bikeforums.net



User Tag List

Page 2 of 2 FirstFirst 12
Results 26 to 33 of 33
  1. #26
    Senior Member lookinUp's Avatar
    Join Date
    Jun 2005
    Location
    Ocala, FL
    My Bikes
    Trek 520 and Trek Madone 5.2
    Posts
    403
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Found a GREAT ROUTE from the north Trailhead to the new extension. Ride south on the Withlacoochee Trail from the (North) trailhead to Citrus Springs Blvd. Go east, crossing US41 and continue to CR39. Go north about 3/4 mile to the extension trailhead on the right. A loop from Gulf Junction to the end of the extension and return on this route is 13+ miles. Low traffic on both these roads and nice scenery.

    Trek Madone 5.2 wsd

  2. #27
    Senior Member JBerman's Avatar
    Join Date
    Mar 2014
    Location
    Inverness, FL
    My Bikes
    2011 Scott Speedster S20
    Posts
    147
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    I'm gonna have to check this out ASAP!

  3. #28
    Senior Member TrailViewMount's Avatar
    Join Date
    Apr 2011
    Location
    Sarasota Florida
    My Bikes
    2013 Trek 8.2 DS
    Posts
    275
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    The trailhead is on Highway 39. 39 is right across from the Sunoco Gas Station 11520 North Florida Avenue (aka Highway 41). Here is my video on the entrance:
    How To Find New Withlacoochee State Trail Extension In Dunnellon - YouTube

  4. #29
    Senior Member Lindaosm's Avatar
    Join Date
    Aug 2009
    Location
    Ocala, FL
    My Bikes
    Trek 7100 WSD & Trek Skye SE
    Posts
    319
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    We rode this yesterday. Not a long trail but beautiful. We ended up riding into Dunnellon for breakfast and then rode back to the trailhead near the ball field. If anyone is coming from the Ocala area you would take Bridge Road (dirt) off of 484 before you get to the bridge that crosses the Rainbow River. That puts you at the eastern most part of the trail. Unfortunately they do not have any signs in place for this one.
    Linda in Ocala/FL

  5. #30
    Senior Member
    Join Date
    Dec 2012
    Location
    North Central Florida
    My Bikes
    2013 Giant RX 0, 2001 Mongoose Pro Triomphe, 2011 Giant TCR Composite, 2014 Giant Escape RX Composite
    Posts
    440
    Mentioned
    3 Post(s)
    Tagged
    0 Thread(s)
    There are two articles in today's (19 April 2014) Citrus County Chronicle about the trail and planning for the connector from Gulf Junction to the Dunnellon trail. You can read them here: ChronicleOnline.com

    Direct article links: New trail, bridge connect counties | ChronicleOnline.com & Project to close the gap | ChronicleOnline.com

  6. #31
    Senior Member Lindaosm's Avatar
    Join Date
    Aug 2009
    Location
    Ocala, FL
    My Bikes
    Trek 7100 WSD & Trek Skye SE
    Posts
    319
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by DowneasTTer View Post
    There are two articles in today's (19 April 2014) Citrus County Chronicle about the trail and planning for the connector from Gulf Junction to the Dunnellon trail. You can read them here: ChronicleOnline.com

    Direct article links: New trail, bridge connect counties | ChronicleOnline.com & Project to close the gap | ChronicleOnline.com

    Thanks for the update. I love this new trail but look forward to the expansion to make it even nicer.
    Linda in Ocala/FL

  7. #32
    Senior Member TrailViewMount's Avatar
    Join Date
    Apr 2011
    Location
    Sarasota Florida
    My Bikes
    2013 Trek 8.2 DS
    Posts
    275
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Here is my video of the new extension: Hope everyone can take a look: New Extension Withlacoochee State Trail Dunnellon Florida 4-11-14 - YouTube

  8. #33
    Senior Member
    Join Date
    Dec 2012
    Location
    North Central Florida
    My Bikes
    2013 Giant RX 0, 2001 Mongoose Pro Triomphe, 2011 Giant TCR Composite, 2014 Giant Escape RX Composite
    Posts
    440
    Mentioned
    3 Post(s)
    Tagged
    0 Thread(s)
    Well it looks like the finishing touches are being done this week. There was word of the office ribbon cutting this Friday (May 16, 2014). However, I can't find anything in print yet. We have been finishing our daily ride here as it is a great way to cool down. Today, Monday, May 12, workers were placing a couple of benches and trash cans. Plus they finally put signage at both trail heads. I talked briefly with what appeared to be the head worker bee about possible picnic tables at the Dunnellon trailhead. He was going to look into it as many times we have been there around noon riders and walkers are siting on the rocks eating. At least there is now a trash can for waste.




Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •