I don't know what the trail looks like south of there but I don't think they're going to hit the Dec 14th completion target on all those orange signs they posted. The detour isn't that big of a deal, just thought I'd let you people know if you're wondering.
#3
Senior Member
Join Date: Nov 2004
Location: Whittier, Ca
Posts: 204
Bikes: 2009 Specialized Robaix Elite
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Passed 183rd this morning...still not completed. The section of the trail further south getting some new asphalt has yet to be completed, as well. I saw some LACPW employees standing around, kicking rocks and playing with some of the lizards, or at least, I thought so. They must have been there for something, obviously not to finish the project. I predict that the construction will be completed sometime next year...
#4
SuperGimp
Thread Starter
I almost got hit by a LDDPW truck the other day on SGRT... I was turning to head down under some road (Alondra? ) and a DPW truck was turning on to the bike path. No looking or anything.
Yeesh.
Yeesh.
#5
Junior Member
Join Date: Oct 2004
Location: Coyote Creek and Orangethorpe, LA/OC
Posts: 16
Bikes: FUJI Transonic SL (2016), BH G6 Pro (2013), BH G5 (2012), BH G5 (2010), Luma RAX (2009) VeloVie Vitesse 300SE (2008), Kuota Kredo (2007), Cannondale CAAD 8 (2005, 2006), Felt F1 (2004), Trek 5200 (2003), Trek 5200 (1994), DiamondBack Master TG (1990)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Liked 1 Time
in
1 Post
The section of San Gabriel River Trail (SGRT) from Del Amo to Carson has been torn up for resurfacing. I was last through there last week (12/07). They've taken out all the old stuff and it's down to just dirt and gravel - very cyclocross-ish, especially with some of the wet weather we've been having. It's "closed" but totally rideable and even a little fun.
#6
Senior Member
Join Date: Nov 2004
Location: Whittier, Ca
Posts: 204
Bikes: 2009 Specialized Robaix Elite
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
So, any updates? I'm hoping things have moved along...not holding my breath, though...
#7
SuperGimp
Thread Starter
I'm going to go check it out on Monday... day 1 of that ludicrous Strave 500 km challenge. I need some easy miles.
#8
Senior Member
Join Date: Nov 2004
Location: Whittier, Ca
Posts: 204
Bikes: 2009 Specialized Robaix Elite
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Rode the trail today...nothing completed, yet. 2 guys watering the trail...that will get it done fellas!
#9
SuperGimp
Thread Starter
#10
Junior Member
Join Date: Oct 2004
Location: Coyote Creek and Orangethorpe, LA/OC
Posts: 16
Bikes: FUJI Transonic SL (2016), BH G6 Pro (2013), BH G5 (2012), BH G5 (2010), Luma RAX (2009) VeloVie Vitesse 300SE (2008), Kuota Kredo (2007), Cannondale CAAD 8 (2005, 2006), Felt F1 (2004), Trek 5200 (2003), Trek 5200 (1994), DiamondBack Master TG (1990)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Liked 1 Time
in
1 Post
Haha! Good one.
I saw it yesterday. It doesn't look like it's changed much in the last two weeks. They've got some boards going up to shape where they'll put the concrete/pavement. Perhaps they're waiting on some aggregate from the crumbling fiscal cliff or were waiting to see if the Mayans were right, first?
I saw it yesterday. It doesn't look like it's changed much in the last two weeks. They've got some boards going up to shape where they'll put the concrete/pavement. Perhaps they're waiting on some aggregate from the crumbling fiscal cliff or were waiting to see if the Mayans were right, first?
#12
SuperGimp
Thread Starter
Alright fine, Ms. Technicality.
So when are the asphalt seeds going to sprout?
So when are the asphalt seeds going to sprout?
#14
Senior Member
Join Date: Sep 2008
Location: Beautiful Long Beach California
Posts: 3,589
Bikes: Eddy Merckx San Remo 76, Eddy Merckx San Remo 76 - Black Silver and Red, Eddy Merckx Sallanches 64 (2); Eddy Merckx MXL;
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 143 Post(s)
Likes: 0
Liked 2 Times
in
2 Posts
Still torn up as of the 3rd.
#15
Just Keep Pedaling
Join Date: Mar 2012
Location: Lakewood, CA
Posts: 3,355
Bikes: 99 Schwinn Mesa GS MTB, 15 Trek Domane 5.9 Dura-Ace, 17 Trek Emonda SL6 Pro & 18 Bianchi Vigorelli
Mentioned: 30 Post(s)
Tagged: 0 Thread(s)
Quoted: 251 Post(s)
Likes: 0
Liked 67 Times
in
34 Posts
Asphalt has been laid down between Carson and Del Amo as of some point this week. Still have it blocked off and as yet need to stripe it but looks like at least SOON this will be ok to ride on...as long as they aren't there working on it.
#16
SuperGimp
Thread Starter
Ah, public works. The gift that keeps on giving.
Thanks for the update(s).
Thanks for the update(s).
#17
Senior Member
Join Date: Sep 2008
Location: Beautiful Long Beach California
Posts: 3,589
Bikes: Eddy Merckx San Remo 76, Eddy Merckx San Remo 76 - Black Silver and Red, Eddy Merckx Sallanches 64 (2); Eddy Merckx MXL;
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 143 Post(s)
Likes: 0
Liked 2 Times
in
2 Posts
They did so well on the southern part of the trail but were just morons on the northern part. Almost a full month behind schedule.
#18
Junior Member
Join Date: Oct 2004
Location: Coyote Creek and Orangethorpe, LA/OC
Posts: 16
Bikes: FUJI Transonic SL (2016), BH G6 Pro (2013), BH G5 (2012), BH G5 (2010), Luma RAX (2009) VeloVie Vitesse 300SE (2008), Kuota Kredo (2007), Cannondale CAAD 8 (2005, 2006), Felt F1 (2004), Trek 5200 (2003), Trek 5200 (1994), DiamondBack Master TG (1990)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Liked 1 Time
in
1 Post
Maybe because the city of Long Beach was able and willing to flex their larger muscle to push the pace whereas now they aren't in such a hurry and the area is also partly Lakewood?
#19
Senior Member
Join Date: Nov 2004
Location: Whittier, Ca
Posts: 204
Bikes: 2009 Specialized Robaix Elite
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I contacted them through their website and received a response. They expect that portion to be completed by the middle of next month. The delays have been due to the weather. Just thought I'd add that...
#20
SuperGimp
Thread Starter
Ha! Weather!
What, it rained almost 5 whole days, that's why it's going to be TWO MONTHS LATE!
Phooey.
What, it rained almost 5 whole days, that's why it's going to be TWO MONTHS LATE!
Phooey.
#22
SuperGimp
Thread Starter
#23
Senior Member
Join Date: Nov 2004
Location: Whittier, Ca
Posts: 204
Bikes: 2009 Specialized Robaix Elite
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
#24
Junior Member
Join Date: Oct 2004
Location: Coyote Creek and Orangethorpe, LA/OC
Posts: 16
Bikes: FUJI Transonic SL (2016), BH G6 Pro (2013), BH G5 (2012), BH G5 (2010), Luma RAX (2009) VeloVie Vitesse 300SE (2008), Kuota Kredo (2007), Cannondale CAAD 8 (2005, 2006), Felt F1 (2004), Trek 5200 (2003), Trek 5200 (1994), DiamondBack Master TG (1990)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Liked 1 Time
in
1 Post
They are the experts, yet they didn't forecast for some rain this winter to accurately estimate the project time?
I'm also disappointed, though not surprised, by how little information they have or share about the progress or their projects. They should have a web page, blog, Twitter feed - something! - to keep us informed, rather than make people email.
I'm also disappointed, though not surprised, by how little information they have or share about the progress or their projects. They should have a web page, blog, Twitter feed - something! - to keep us informed, rather than make people email.
#25
SuperGimp
Thread Starter
They are the experts, yet they didn't forecast for some rain this winter to accurately estimate the project time?
I'm also disappointed, though not surprised, by how little information they have or share about the progress or their projects. They should have a web page, blog, Twitter feed - something! - to keep us informed, rather than make people mad.
I'm also disappointed, though not surprised, by how little information they have or share about the progress or their projects. They should have a web page, blog, Twitter feed - something! - to keep us informed, rather than make people mad.
They're expert all right... you ever see a public works project that didn't involve at least 5 people standing around doing nothing?