Advertise on Bikeforums.net



User Tag List

Results 1 to 7 of 7
  1. #1
    Senior Member
    Join Date
    Feb 2012
    Location
    SoCal
    My Bikes
    1983 Trek 620, 2010 Roubaix
    Posts
    370
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Bike path status along US101 south of Carpenteria

    Anybody know if the US101 construction project South of Carpenteria has closed the bike path? I'm referring to the path along 101 between the Mobil Pier and Batrs Road.

    Thanks!

  2. #2
    Senior Member
    Join Date
    Nov 2003
    Location
    Conejo Valley, CA
    My Bikes
    Domane 4.3
    Posts
    2,417
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    The path heading south along the beach is closed for construction. All north and south bike traffic is now routed on the other side, the north bound lanes of the 101. The path is separated from the freeway by concrete barriers right now.
    [insert clever quote here]

  3. #3
    Senior Member
    Join Date
    Feb 2012
    Location
    SoCal
    My Bikes
    1983 Trek 620, 2010 Roubaix
    Posts
    370
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Thanks -- it sounds rideable enough. I appreciate the info!

  4. #4
    Senior Member volosong's Avatar
    Join Date
    Apr 2011
    Location
    Antelope Valley, SoCal
    Posts
    2,483
    Mentioned
    3 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by nesdog View Post
    The path heading south along the beach is closed for construction. All north and south bike traffic is now routed on the other side, the north bound lanes of the 101. The path is separated from the freeway by concrete barriers right now.
    That is good news! Let us all hope that after construction, they retain the barriers.
    Deut 6:5

    ---

    "Ha ha! You fool! You fell victim to one of the classic blunders - The most famous of which is 'never get involved in a land war in Asia'".
    - Vizzini during his "battle of wits" with the Man in Black

  5. #5
    Senior Member
    Join Date
    Nov 2003
    Location
    Conejo Valley, CA
    My Bikes
    Domane 4.3
    Posts
    2,417
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    After the construction is done, both lanes of bike traffic will be on the south side, I believe.
    [insert clever quote here]

  6. #6
    Senior Member CommuteCommando's Avatar
    Join Date
    Jul 2008
    Location
    Southern CaliFORNIA.
    My Bikes
    KHS Alite 500, Trek 7.2 FX , Masi Partenza, Masi Fixed Special, Masi Cran Criterium
    Posts
    2,941
    Mentioned
    4 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by nesdog View Post
    After the construction is done, both lanes of bike traffic will be on the south side, I believe.
    When they are done it will be similar to what they did here in San Diego. 52 - San Diego, CA. I drew the map to show how the path entrances and exits to city streets
    As much as you paid for that Beemer [Mercedies, Audi, Escalade], I'm surprised it didn't come equipped with turn signals.

  7. #7
    rlp
    rlp is offline
    Member
    Join Date
    Sep 2008
    Location
    Thousand Oaks
    My Bikes
    Franco Kanan, Santana Arriva and Beyond Tandems
    Posts
    34
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    There is a picture of a nearly completed section here.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •