Dallas Riders - Road Construction - East Fork Rd
#1
Member
Thread Starter
Join Date: Aug 2012
Location: Dallas
Posts: 48
Bikes: 2011 Trek 2.1 Alpha - my first purchased brand new bike. Brought used before this one
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Dallas Riders - Road Construction - East Fork Rd
Saw the equipment today during ride. If anyone knows more, please post here.
Road Construction - East Fork Rd
Reconstruction of roadway will begin May 13. The limits of the reconstruction will be from Tripp Rd to Town East. Expect delays due to lane closures if at all possible please alter your route to avoid using East Fork during this time period.
https://www.townofsunnyvale.org/CivicAlerts.aspx?AID=232
Road Construction - East Fork Rd
Reconstruction of roadway will begin May 13. The limits of the reconstruction will be from Tripp Rd to Town East. Expect delays due to lane closures if at all possible please alter your route to avoid using East Fork during this time period.
https://www.townofsunnyvale.org/CivicAlerts.aspx?AID=232
#2
Member
Thread Starter
Join Date: Aug 2012
Location: Dallas
Posts: 48
Bikes: 2011 Trek 2.1 Alpha - my first purchased brand new bike. Brought used before this one
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Talked to the City of Sunnyvale today. This work will last two weeks and is to be completed by June 1st for a large ride using that route.
They will be removing a layer of road, working on the sub-base and repaving the road.
They will be removing a layer of road, working on the sub-base and repaving the road.
Thread
Thread Starter
Forum
Replies
Last Post
twar
Touring
11
09-01-10 09:27 AM