View Single Post
Old 07-16-05, 03:07 PM
  #3  
Maelstrom 
Wood Licker
 
Maelstrom's Avatar
 
Join Date: Apr 2002
Location: Whistler,BC
Posts: 16,966

Bikes: Trek Fuel EX 8 27.5 +, 2002 Transition Dirtbag, Kona Roast 2002

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 23 Post(s)
Likes: 0
Liked 2 Times in 2 Posts
For example, gargamel has been 3 years in the making. Steady work, 1 builder (and I assume friends) and it seems, anyways, he has avoided natural runoffs and or worked them to advantage.

Another thing, if a trail Can't be build with the runoffs in mind, then trails here get reworked every few years to allow drainage to fix itself. This is usually a last resort and is almost always because of older trails being built without the environment in mind.
Maelstrom is offline