Originally Posted by
blakcloud
Now you would think that waiting six weeks is the worst part of this experience but it isn't. Curbside happened to have two Moultons on the show room floor and one was the TSR 2 in orange. They asked me if I wanted to test drive it but I knew if I did I would have walked out with that bike in my hands.
There are certainly worse bikes to walk out with ..