Bike Forums

Bike Forums (https://www.bikeforums.net/forum.php)
-   Commuting (https://www.bikeforums.net/commuting/)
-   -   'Urban Grinder' build (https://www.bikeforums.net/commuting/1158382-urban-grinder-build.html)

Keiffith 11-02-18 07:34 PM

Frame wont be in till december, so im slowly ordering parts as my budget allows.

Next on the order block is BB, crankset, and headset.

acidfast7 11-04-18 03:36 AM


Originally Posted by Keiffith (Post 20645791)
Frame wont be in till december, so im slowly ordering parts as my budget allows.

Next on the order block is BB, crankset, and headset.

This sounds like my house. It's a hugely long and expensive process as are most things worth doing :)

Sorry that I **** on your thread earlier.

srestrepo 12-30-19 11:26 PM


Originally Posted by Keiffith (Post 20645791)
Frame wont be in till december, so im slowly ordering parts as my budget allows.

Next on the order block is BB, crankset, and headset.

hey man, wondering if that frame ever got put together from last december...


All times are GMT -6. The time now is 01:38 PM.


Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.