Go Back  Bike Forums > Bike Forums > General Cycling Discussion
Reload this Page >

Trek’s very long lead time pushing me to buy other brands readily available

Notices
General Cycling Discussion Have a cycling related question or comment that doesn't fit in one of the other specialty forums? Drop on in and post in here! When possible, please select the forum above that most fits your post!

Trek’s very long lead time pushing me to buy other brands readily available

Old 01-11-21, 02:21 PM
  #1  
RMD2020
Newbie
Thread Starter
 
Join Date: May 2020
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Trek’s very long lead time pushing me to buy other brands readily available

With the high demand of the Treks does anybody considering to buy other Brands?, is it worth it to wait almos a year for an Emonda SL. Endurance SL Canyon instead .... what does anyone think?. Your feedback would be greatly appreciated.
RMD2020 is offline  
Old 01-11-21, 02:25 PM
  #2  
Kapusta
Cyclochondriac
 
Join Date: Feb 2017
Posts: 4,097
Mentioned: 26 Post(s)
Tagged: 0 Thread(s)
Quoted: 1761 Post(s)
Liked 1,022 Times in 614 Posts
I am sure many people consider different brands regardless of lead time.
Kapusta is offline  
Old 01-11-21, 02:32 PM
  #3  
Troul 
:D
 
Troul's Avatar
 
Join Date: Oct 2013
Location: Mich
Posts: 3,029
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 6 Post(s)
Liked 490 Times in 346 Posts
if there are many options that you like, but the one you picked out is 12 months out; then 2nd option it is.
__________________
-Oh Hey!
Troul is offline  
Likes For Troul:
Old 01-11-21, 02:53 PM
  #4  
indyfabz
Senior Member
 
indyfabz's Avatar
 
Join Date: Jan 2010
Posts: 28,828
Mentioned: 197 Post(s)
Tagged: 1 Thread(s)
Quoted: 12536 Post(s)
Liked 4,673 Times in 2,409 Posts
There are brands other than Trek?
indyfabz is offline  
Old 01-11-21, 02:56 PM
  #5  
bOsscO
bOsscO
 
bOsscO's Avatar
 
Join Date: May 2006
Location: Vancouver
Posts: 414

Bikes: 2015 Norco Search S1, 2012 Cervelo R5, 93 Mongoose IBOC COMP

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 168 Post(s)
Liked 184 Times in 109 Posts
Originally Posted by indyfabz View Post
There are brands other than Trek?
Lol
bOsscO is offline  
Old 01-11-21, 02:59 PM
  #6  
mack_turtle
n00b
 
Join Date: Jan 2008
Location: Austin, TX
Posts: 1,397

Bikes: Surly Karate Monkey, Twin Six Standard Rando

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 422 Post(s)
Liked 448 Times in 269 Posts
Trek is not the only company that is suffering from very long delays in the supply chain due to Covid-19.
mack_turtle is offline  
Likes For mack_turtle:
Old 01-11-21, 03:00 PM
  #7  
pdlamb
Senior Member
 
Join Date: Dec 2010
Location: northern Deep South
Posts: 6,507

Bikes: Fuji Touring, Novara Randonee

Mentioned: 31 Post(s)
Tagged: 0 Thread(s)
Quoted: 1439 Post(s)
Liked 561 Times in 374 Posts
I could get a custom bike in two months!
pdlamb is offline  
Likes For pdlamb:
Old 01-11-21, 03:03 PM
  #8  
Reflector Guy
Senior Member
 
Reflector Guy's Avatar
 
Join Date: Jul 2020
Location: Chicago
Posts: 564

Bikes: '17 Trek, '20 Bianchi, '77 Sears Free Spirit (long since retired)

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 259 Post(s)
Liked 423 Times in 202 Posts
Originally Posted by RMD2020 View Post
With the high demand of the Treks does anybody considering to buy other Brands?, is it worth it to wait almos a year for an Emonda SL. Endurance SL Canyon instead .... what does anyone think?. Your feedback would be greatly appreciated.
Do you buy bikes that often that a long wait puts a big crimp in your timetable?
Reflector Guy is offline  
Old 01-11-21, 03:05 PM
  #9  
mstateglfr 
Sunshine
 
mstateglfr's Avatar
 
Join Date: Aug 2014
Location: Des Moines, IA
Posts: 12,035

Bikes: '18 class built steel roadbike, '19 Fairlight Secan, '88 Schwinn Premis , Black Mountain Cycles Monstercross V4, '89 Novara Trionfo

Mentioned: 97 Post(s)
Tagged: 0 Thread(s)
Quoted: 4891 Post(s)
Liked 2,131 Times in 1,272 Posts
Originally Posted by RMD2020 View Post
With the high demand of the Treks does anybody considering to buy other Brands?, is it worth it to wait almos a year for an Emonda SL. Endurance SL Canyon instead .... what does anyone think?. Your feedback would be greatly appreciated.
Do you geek for Trek?...then wait the year and ride what you have now.
Do you not have a bike at all right now? Then go buy basically anything else thats in stock sooner- you wont know any difference as itll all be new and more bike than you need.


I cant imagine deciding to buy a bike and only looking at a single brand. That seems quite limiting and for no good reason.
mstateglfr is offline  
Likes For mstateglfr:
Old 01-11-21, 03:10 PM
  #10  
shelbyfv
Senior Member
 
shelbyfv's Avatar
 
Join Date: Jun 2007
Location: TN
Posts: 7,875
Mentioned: 29 Post(s)
Tagged: 0 Thread(s)
Quoted: 2071 Post(s)
Liked 1,798 Times in 977 Posts
I've heard rumors of various supply shortages.
shelbyfv is offline  
Likes For shelbyfv:
Old 01-11-21, 03:12 PM
  #11  
Bosco13
Junior Member
 
Join Date: Jul 2020
Posts: 19
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Likes: 0
Liked 13 Times in 6 Posts
I wouldn't buy a Trek, so the answer is easy for me. I would consider Canyon.
Bosco13 is offline  
Likes For Bosco13:
Old 01-11-21, 03:22 PM
  #12  
jaxgtr
Senior Member
 
jaxgtr's Avatar
 
Join Date: Jul 2006
Location: Jacksonville, FL
Posts: 4,759

Bikes: Trek Domane SLR 7, Trek ALR 6, Trek CrossRip, Trek X-Caliber 8

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 92 Post(s)
Liked 189 Times in 114 Posts
I did, but then I just went Project One...the Trek just fit me better....The lead time went from 6 months to 3 days...Project One it is then.
__________________
Brian | 2021 Trek Domane SLR 7 | 2016 Trek Emonda ALR 6 | 2016 Trek X-Caliber 8 | 2014 Trek CrossRip Comp
Originally Posted by AEO View Post
you should learn to embrace change, and mock it's failings every step of the way.







jaxgtr is offline  
Likes For jaxgtr:
Old 01-11-21, 03:52 PM
  #13  
veganbikes
Clark W. Griswold
 
Join Date: Mar 2014
Location: ,location, location
Posts: 7,740

Bikes: Foundry Chilkoot Ti W/Ultegra Di2, Salsa Timberjack Ti, Cinelli Mash Work RandoCross Fun Time Machine, 1x9 XT Parts Hybrid, Co-Motion Cascadia, Specialized Langster, Phil Wood Apple VeloXS Frame (w/DA 7400), Cilo Road Frame, Proteus frame, Ti 26 MTB

Mentioned: 35 Post(s)
Tagged: 0 Thread(s)
Quoted: 2038 Post(s)
Liked 946 Times in 664 Posts
I never really considering buying a Trek but most brands are suffering shortages these days as EVERYONE WANT A BIKE! It is not a Trek problem it is a global brand problem for everyone. I don't think there are many brands not suffering a shortage except maybe custom builders and even they are probably facing component shortages and maybe are having a tough time getting certain tubing?

I would buy a Trek if they offered a me a Fuel 9.9 XTR for $500 and offered to repaint it without a massive trek billboard. I would then probably sell the frame and wheels and cockpit and buy a nice custom bike and put the XTR and Fox Shox on that.
veganbikes is offline  
Old 01-11-21, 04:52 PM
  #14  
Koyote
Senior Member
 
Join Date: Sep 2017
Posts: 3,081
Mentioned: 25 Post(s)
Tagged: 0 Thread(s)
Quoted: 2224 Post(s)
Liked 2,867 Times in 1,289 Posts
Originally Posted by shelbyfv View Post
I've heard rumors of various supply shortages.
Koyote is offline  
Likes For Koyote:
Old 01-11-21, 04:55 PM
  #15  
Koyote
Senior Member
 
Join Date: Sep 2017
Posts: 3,081
Mentioned: 25 Post(s)
Tagged: 0 Thread(s)
Quoted: 2224 Post(s)
Liked 2,867 Times in 1,289 Posts
I don't think a Trek would get along with this bike:


Koyote is offline  
Likes For Koyote:
Old 01-11-21, 06:18 PM
  #16  
WhyFi
Senior Member
 
WhyFi's Avatar
 
Join Date: Jan 2010
Location: TC, MN
Posts: 32,965

Bikes: R3 Disc, Haanjo

Mentioned: 342 Post(s)
Tagged: 1 Thread(s)
Quoted: 15441 Post(s)
Liked 4,303 Times in 2,263 Posts
Out of Trek's road bike lines, the Emonda is the least likely to keep me locked in to the brand. The Domane has the tire clearance and front and rear IsoSpeed. The Madone had rear Iso and the slick aero design. The Emonda is... light?
WhyFi is offline  
Old 01-11-21, 06:20 PM
  #17  
Moisture
Drip, Drip.
 
Moisture's Avatar
 
Join Date: Oct 2020
Posts: 770
Mentioned: 4 Post(s)
Tagged: 0 Thread(s)
Quoted: 517 Post(s)
Liked 87 Times in 71 Posts
No, its not. Buying any bike new is not worth it imo.
Moisture is offline  
Old 01-11-21, 06:30 PM
  #18  
UCantTouchThis
Senior Member
 
Join Date: Dec 2020
Posts: 474
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 143 Post(s)
Liked 362 Times in 170 Posts
Happened to me when buying a tandem. I really wanted a Trek but the lead time was almost a year. Bought another brand and have not regretted it.
UCantTouchThis is offline  
Old 01-11-21, 06:33 PM
  #19  
GlennR
On Your Left
 
GlennR's Avatar
 
Join Date: Nov 2011
Location: Long Island, New York, USA
Posts: 7,736

Bikes: Trek Emonda SLR, Sram eTap, Zipp 303

Mentioned: 32 Post(s)
Tagged: 0 Thread(s)
Quoted: 2569 Post(s)
Liked 1,686 Times in 866 Posts
My LBS hasn't has a Specialized since last Spring.
GlennR is offline  
Likes For GlennR:
Old 01-11-21, 07:15 PM
  #20  
sincos
Member
 
Join Date: Nov 2020
Posts: 42
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 22 Post(s)
Liked 24 Times in 14 Posts
Originally Posted by Koyote View Post
I don't think a Trek would get along with this bike:


Nice ... that wouldn't be one that Trek built?
sincos is offline  
Old 01-11-21, 07:18 PM
  #21  
indyfabz
Senior Member
 
indyfabz's Avatar
 
Join Date: Jan 2010
Posts: 28,828
Mentioned: 197 Post(s)
Tagged: 1 Thread(s)
Quoted: 12536 Post(s)
Liked 4,673 Times in 2,409 Posts
How do you pronounce “Emonda”?
indyfabz is offline  
Old 01-11-21, 07:21 PM
  #22  
GlennR
On Your Left
 
GlennR's Avatar
 
Join Date: Nov 2011
Location: Long Island, New York, USA
Posts: 7,736

Bikes: Trek Emonda SLR, Sram eTap, Zipp 303

Mentioned: 32 Post(s)
Tagged: 0 Thread(s)
Quoted: 2569 Post(s)
Liked 1,686 Times in 866 Posts
Originally Posted by indyfabz View Post
How do you pronounce “Emonda”?
It's pronounced....Émonda
GlennR is offline  
Old 01-11-21, 08:02 PM
  #23  
Koyote
Senior Member
 
Join Date: Sep 2017
Posts: 3,081
Mentioned: 25 Post(s)
Tagged: 0 Thread(s)
Quoted: 2224 Post(s)
Liked 2,867 Times in 1,289 Posts
Originally Posted by sincos View Post
Nice ... that wouldn't be one that Trek built?
Sure. But they did not subsequently treat Greg very well.
Koyote is offline  
Likes For Koyote:
Old 01-11-21, 08:36 PM
  #24  
mack_turtle
n00b
 
Join Date: Jan 2008
Location: Austin, TX
Posts: 1,397

Bikes: Surly Karate Monkey, Twin Six Standard Rando

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 422 Post(s)
Liked 448 Times in 269 Posts
Originally Posted by shelbyfv View Post
I've heard rumors of various supply shortages.
I've heard dozens of well-documented supply shortage issues from a broad spectrum of bicycle suppliers and manufacturer. It's been discussed with interviews of representatives all over. maybe you were being sarcastic, but it's not exactly "rumors" and has been well known for over nine months that this is a major problem. We'll survive the bicycle shortage.

Last edited by mack_turtle; 01-12-21 at 07:54 AM.
mack_turtle is offline  
Old 01-11-21, 09:02 PM
  #25  
70sSanO
Senior Member
 
70sSanO's Avatar
 
Join Date: Feb 2015
Location: Mission Viejo
Posts: 2,877

Bikes: 1986 Cannondale SR400 (Flat bar commuter), 1988 Cannondale Criterium XTR, 1992 Serotta T-Max, 1995 Trek 970

Mentioned: 12 Post(s)
Tagged: 0 Thread(s)
Quoted: 750 Post(s)
Liked 512 Times in 348 Posts
Originally Posted by indyfabz View Post
How do you pronounce “Emonda”?
I’m not sure how to pronounce it.

But it is French and I think it means “No Official Winner”.

John
70sSanO is offline  

Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service - Do Not Sell My Personal Information -

Copyright © 2021 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.