Go Back  Bike Forums > Community Connections > Regional Discussions > Northeast
Reload this Page >

Valley Forge desecration put on hold for 15 years

Search
Notices
Northeast Connecticut | Maine | Massachusetts | New Hampshire | New Jersey | New York |Rhode Island | Vermont |

Valley Forge desecration put on hold for 15 years

Thread Tools
 
Search this Thread
 
Old 04-08-09, 09:20 AM
  #1  
Senior Member
Thread Starter
 
SPlKE's Avatar
 
Join Date: Sep 2007
Posts: 858
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 17 Post(s)
Liked 39 Times in 21 Posts
Valley Forge desecration put on hold for 15 years

Ding dong, the witch is almost dead.

If any of you readers use the bike path from VF to Perkiomen, this would have been on your left, in what is now wooded land within the VF National Park.

Now that the developers are putting their "educational" hotel on hold, they will probably elect not to build the museum, since the museum isn't going to be a cash cow like a hotel.

Congrats to NPCA, the US National Park Service, letter-writing citizens, and others who have seen this cynical land grab by developers for what it is, and have tirelessly fought to keep this unique, historic land undeveloped.

Next up: change the zoning for this piece of land for once and for all to prevent future attacks by greedy developers.




Hotel at Valley Forge Park put off

By Jeff Gammage

Inquirer Staff Writer

Depending on your point of view, the structure was going to be a scholar's dormitory that would enhance historical understanding of Valley Forge - or a hotel that would speed the commercialization of a treasured national park.

Either way, its construction is now in serious doubt.

The head of the American Revolution Center, a controversial museum complex planned for 78 acres of private land inside the park, yesterday announced a voluntary 15-year moratorium on building a particularly contentious piece of the project, the conference center.

ARC president and chief executive officer Bruce Cole said the decision was the result of an ongoing evaluation of ARC's purpose and mission, and a desire to focus on core programming.

The conference center has consistently been presented as an integral part of the $375 million development, one of its three major components, joining a museum and a trailhead building. It was to stand four stories tall and provide up to 99 rooms for lodging.

Opponents of ARC greeted yesterday's move with cautious optimism.

"It's a great first step," said Deirdre Gibson, the park's chief of planning and resource management. "Up until now, it's just been a relentless drive to develop."

Gibson testified during zoning hearings that building the museum complex would do serious damage to the national park, both to its natural landscape and its historic character. Yesterday, while welcoming the moratorium, she pointed out that "the zoning, which allows an astonishing amount of future development, isn't going away. That's still there."

In an interview yesterday, Cole reiterated what he said when he took over in January: Everything is on the table except for moving the site.

"The sole mission of ARC is a museum and education programs - local, national and international," he said. "I hope that this 15-year moratorium will allow us to move forward and work with everyone who is concerned with ARC."

He called the halt "a true moratorium that we revisit in 15 years. That's way down the road. ... We have to stick to our mission and only build both physically and virtually what is appropriate for ARC."

Eliminating the conference center would substantially reduce the cost of the project - no figures were available yesterday - and shrink the area used for construction.

In January, Cole said ARC would proceed with plans to build on property north of the Schuylkill, but that everything else about the project - its size, design and layout - was up for review. Until yesterday, the project consisted of a three-story museum, the hotel and conference center, and a trailhead structure containing bike racks and bathrooms.

ARC's 78 acres are virtually surrounded by national park land. The organization has scheduled a groundbreaking ceremony for May, but has not released a timetable for construction of the museum and trailhead building.

In a long and contentious approval process, ARC won vote after vote before the Lower Providence Board of Supervisors and the township zoning board, which has jurisdiction over the property. But it provoked enormous hostility among opponents. Park Service officials, nonprofit-group leaders and park neighbors insist the construction of ARC will desecrate a national landmark.

The project also faces a challenge in federal court from several Lower Providence property owners and the National Parks Conservation Association.

"This certainly sounds like a step in the right direction," Joy Oakes, senior director of the NPCA's Mid-Atlantic office, said after learning of the moratorium. But, she asked, "What happens in 15 years? The zoning would still allow a lot of inappropriate things to be built.

"The larger question is, is this the right site for a museum? ... I think a reasonable person can say it isn't."

ARC enacted the moratorium after consulting with government officials in Lower Providence.

"The 15-year moratorium on the conference center allows the focus to fall on the museum and its integrated education program, the most important aspects of the project," Township Manager Joseph Dunbar said in a statement.

ARC also released partial results of a Zogby poll that it said showed broad support among Lower Providence Township residents for the development.

"One of the things I'm doing," Cole said, "is trying to raise the profile of ARC in the region, but also nationally and internationally. I've been going and meeting lots and lots of people - quite a few people who are supportive."

https://www.philly.com/inquirer/local...k_put_off.html
SPlKE is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.