Time Impact cleat longevity
#1
Rides with Cows
Thread Starter
Join Date: Apr 2003
Location: Fixing a flat
Posts: 1,232
Bikes: Trek 7000
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Time Impact cleat longevity
Does anyone know how long these plastic cleats last before you have to replace them?
__________________

#2
Senior Member
Join Date: May 2004
Posts: 284
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Had the same concern after inheriting a set of Impact pedals from a used bike. There is not much meat to these cleats , especially up front. The cleats have held up real well, though. I try not to do the moonwalk when wearing bike shoes. Mine are over a year old and still snap in and float properly, even though they are somewhat rounded. Time pedals are tough to beat but spendy as are the cleats.
#3
Senior Member
Join Date: Aug 2003
Location: San Francisco, CA
Posts: 150
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I think I wear out a pair every year. The first thing to go on mine is usually the front plastic piece (one of the "pontoons") -- it starts to crack after so many clip-ins and outs and stepping on the ground. When that happens it's hard to clip into the pedal. I also find the Time Impact cleats to be much more expensive than, say, the Look ones. When I wear out my current pair I'll probably switch to a different pedal system because Time has replaced these with some new design and I just want to stick with something that's not going to change so much and so often.
-Kevin
-Kevin
#5
Senior Member
Join Date: Mar 2004
Location: La Verne CA
Posts: 5,048
Bikes: Litespeed Liege, Motorola Team Issue Eddy Mercxk, Santana Noventa Tandem, Fisher Supercaliber Mtn. Bike
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 13 Post(s)
Likes: 0
Liked 10 Times
in
6 Posts
The new cafe cleat will work on both the new rxs pedals and the older impact models.. I bought some on ebay.. 22.00 shipped price..
https://cgi.ebay.com/ws/eBayISAPI.dll...sPageName=WDVW
https://cgi.ebay.com/ws/eBayISAPI.dll...sPageName=WDVW
#6
Rides with Cows
Thread Starter
Join Date: Apr 2003
Location: Fixing a flat
Posts: 1,232
Bikes: Trek 7000
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Originally Posted by socalrider
The new cafe cleat will work on both the new rxs pedals and the older impact models.. I bought some on ebay.. 22.00 shipped price..
https://cgi.ebay.com/ws/eBayISAPI.dll...sPageName=WDVW
https://cgi.ebay.com/ws/eBayISAPI.dll...sPageName=WDVW
__________________

#7
Senior Member
Join Date: Oct 2003
Posts: 563
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
yes, that's what i heard as well. the impact cleats won't work with the new RXS pedals, but the new cleat will work with the older impact pedals.