Time Impact versus Look CX6
#1
Senior Member
Thread Starter
Join Date: Oct 2002
Location: Southern Maine
Posts: 8,941
Mentioned: 130 Post(s)
Tagged: 0 Thread(s)
Quoted: 12192 Post(s)
Liked 1,495 Times
in
1,107 Posts
Hi,
I am going to get some pedals with adjustable Q. Looks like I am limited to either the Impact or the CX. Looks like the Impact is a lot cheaper. Has anyone tried these pedals? Thanks.
I am going to get some pedals with adjustable Q. Looks like I am limited to either the Impact or the CX. Looks like the Impact is a lot cheaper. Has anyone tried these pedals? Thanks.
#2
Back in the Sooner State
Join Date: Aug 2002
Location: Norman, OK
Posts: 2,572
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I've got CX-6's and love them. I've ridden Looks for years now and was always annoyed by the incessant squeaking that they are known for. But I don't have that with the CX's. I theorize that it has to do with the carbon pedal body as opposed to metal in their other pedals, but I don't know for sure. At any rate, I've had them since last spring and they've been great. Very smooth, nice and light with Look's usually solid pedal/cleat interface and big contact area.
#3
Ink-Stained Wretch
Join Date: Jun 2003
Location: Holyoke, MA
Posts: 1,731
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I ride Impacts after having ridden Looks (247s). Love them, feel much more securely locked into them then the Looks. Biggest problem is that replacing the cleats costs a bunch if you have to buy them through a shop.
#4
Senior Member
Join Date: Sep 2004
Location: Sacramento, CA
Posts: 214
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I ride the impacts and like them, previously I had 1990 Time Ti-mags, nothin lasts forever. After destroying my knees with some of the early looks I switched to time and haven't looked back. All the pedals have improved but I'm not willing change brands.
#5
Back in the Sooner State
Join Date: Aug 2002
Location: Norman, OK
Posts: 2,572
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Look float cleats do wonders, but I'm just like you. I switched to Looks from SPD's when I was about 17 and have stuck with them for the last 11 years. And they do get better over time...
#6
Senior Member
Join Date: Jul 2004
Location: Wisconsin
Posts: 1,646
Bikes: Lemond Arrivee, Felt F1 Road, Tomac Revolver(full), GT race (hardtail)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 1 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Originally Posted by late
Hi,
I am going to get some pedals with adjustable Q. Looks like I am limited to either the Impact or the CX. Looks like the Impact is a lot cheaper. Has anyone tried these pedals? Thanks.
I am going to get some pedals with adjustable Q. Looks like I am limited to either the Impact or the CX. Looks like the Impact is a lot cheaper. Has anyone tried these pedals? Thanks.