Go Back  Bike Forums > Community Connections > Regional Discussions > Texas
Reload this Page >

Fort Worth Trinity River Bridge Plans (Hulen)

Search
Notices

Fort Worth Trinity River Bridge Plans (Hulen)

Thread Tools
 
Search this Thread
 
Old 08-05-09, 02:57 PM
  #1  
You gonna eat that?
Thread Starter
 
Doohickie's Avatar
 
Join Date: Sep 2008
Location: Fort Worth, Texas Church of Hopeful Uncertainty
Posts: 14,715

Bikes: 1966 Raleigh DL-1 Tourist, 1973 Schwinn Varsity, 1983 Raleigh Marathon, 1994 Nishiki Sport XRS

Mentioned: 6 Post(s)
Tagged: 0 Thread(s)
Quoted: 164 Post(s)
Liked 67 Times in 44 Posts
Fort Worth Trinity River Bridge Plans (Hulen)



I just learned of this:
If I understand correctly, as part of the Hwy 121 extension, the Hulen, and Bryant-Irvin bridges will come down over the Trinity Trails.

A new bridge - with Bicycle and Pedestrian access - will be built! The Bike/Ped access will be suspended below and connect to Trinity Trails!


More from City of Fort Worth public release:
----------------------------------------------------------
Clearfork Main Street Bridge Design To Be Unveiled
The City of Fort Worth will unveil the final design for the Clearfork Main Street Bridge at an open house from 6:30-8:30 p.m. Aug. 6 (Thursday) at the Fort Worth Botanic Garden Center, 3220 Botanic Garden Blvd.

Exhibits about the bridge and plans for the surrounding area will be on display, and there will be a brief presentation in the auditorium. City staff and members of the design team will discuss the bridge.

The 1,800-foot roadway and bridge will connect Stonegate Boulevard to the planned Clearfork Main Street in southwest Fort Worth, linking Hulen Street to Bryant Irvin Road and the Southwest Parkway. The bridge will carry four lanes of traffic across the Trinity River. A separate pedestrian crossing will be suspended from the bridge to accommodate foot and bicycle traffic.

The pedestrian level will feature eight overlooks, four on each side. The design includes trail links on both banks of the river.
-------------------------------------------------------------------------
__________________
I stop for people / whose right of way I honor / but not for no one.


Originally Posted by bragi "However, it's never a good idea to overgeneralize."
Doohickie is offline  
Old 08-06-09, 01:36 PM
  #2  
Junior Member
 
Join Date: Jun 2009
Location: Fort Worth, Tx
Posts: 23

Bikes: Trek 7200

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Nice! I hope trail access isn't blocked for too long while it's built though.
Kenbone is offline  
Old 08-06-09, 01:54 PM
  #3  
It's true, man.
 
Join Date: Aug 2005
Location: North Texas
Posts: 2,726

Bikes: Cannondale T1000, Inbred SS 29er, Supercaliber 29er, Crescent Mark XX, Burley Rumba Tandem

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
That'll help out on my commute because it'll cut out the times I have to ride up around Colonial CC to Rogers when the water's over the low water crossing.

I'm curious if the will be access up to the Central Market from the Clearfork Main route.


It'll probably chase off the wild turkeys and foxes in that section, too though...
truman is offline  
Old 08-07-09, 09:52 PM
  #4  
You gonna eat that?
Thread Starter
 
Doohickie's Avatar
 
Join Date: Sep 2008
Location: Fort Worth, Texas Church of Hopeful Uncertainty
Posts: 14,715

Bikes: 1966 Raleigh DL-1 Tourist, 1973 Schwinn Varsity, 1983 Raleigh Marathon, 1994 Nishiki Sport XRS

Mentioned: 6 Post(s)
Tagged: 0 Thread(s)
Quoted: 164 Post(s)
Liked 67 Times in 44 Posts
After going to the meeting I found out a few things:

. The new bridge will connect to a development called Clearfork. It will not run straight through, but will connect from Hulen to Bryant Irvin in the patch of land between the train yard and the river.

. The basic roads in Clearfork will be complete prior to the bridge. The bridge is supposed to be open by the summer of 2011. So as soon as it opens there will be connectivity between Hulen and Bryant Irvin.

. The Trinity River Trail will remain open throughout construction. This was stated in the meeting but hard to imagine how they can build a bridge over the trail with out at least some spot closures.

. This bridge will not affect access to the north side of the train yard. However, the Hulen Street bridge over the train yard and Vickery will be reconstructed as part of the Southwest Parkway construction and will include a cycle/pedestrian lane that is separate from the motorized lanes.

. The Clearfork bridge will consist of three separate spans. There will be east- and west-bound spans for motor traffic. Hanging in between the two, and at a lower level, will be the cycle/pedestrian span. There is a pretty long approach to the motor lanes and it will be quite a bit higher than the cycle/pedestrian span, which will basically be at a level right at the top of the levee; i.e., no climbing to cross the bridge, and it will run between the trails on either side of the river. There will also be a "through lane" that will go under all the spans so cyclists don't have to slow down for bridge traffic.
__________________
I stop for people / whose right of way I honor / but not for no one.


Originally Posted by bragi "However, it's never a good idea to overgeneralize."
Doohickie is offline  
Old 08-10-09, 07:19 AM
  #5  
It's true, man.
 
Join Date: Aug 2005
Location: North Texas
Posts: 2,726

Bikes: Cannondale T1000, Inbred SS 29er, Supercaliber 29er, Crescent Mark XX, Burley Rumba Tandem

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Sounds neato. Thx for the scoop
truman is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.