Hopefully someone in charge at CSX will realize the importance of fixing the bridge and prioritize its repair. It looks like fencing and decking and probably some supports need to be replaced. Not that big a deal, unless the company is run by lawyers.
|
Originally Posted by u235
(Post 21258714)
Good to know. I haven't been north of Brunswick since May. I remember just north of HF being dirt like with a lot of ruts. I don't remember the details of the surface between HF and Brunswick but it was different. I do ride the southern section a lot. They did a 5 mile section from Whites Ferry south with the crushed stone liek you described this year too. It was done in phases over a few months. It ended up settling out to a decent surface but for a while it was like oatmeal and loose. Eventually the excess fines bed in or wash off and and the slurry subsides, at least it did there. I prefer the random packed larger gravel over the new crushed they are doing but that's me.
I was walking the canal yesterday from Nolands Ferry to and from Monocacy yesterday. I could not see the bottom of my shoes when done. Had to scrape the stones off. |
Originally Posted by alan s
(Post 21258875)
Hopefully someone in charge at CSX will realize the importance of fixing the bridge and prioritize its repair. It looks like fencing and decking and probably some supports need to be replaced. Not that big a deal, unless the company is run by lawyers.
|
Originally Posted by travbikeman
(Post 21258982)
They have extended the new stone from Whites Ferry to past Nolands Ferry. Currently working on re-stoning from Nolands Ferry to Brunswick. Brunswick all the way to Shepherdstown has been completed. Makes for easier bike riding, but will admit it is oatmeal right now.
I was walking the canal yesterday from Nolands Ferry to and from Monocacy yesterday. I could not see the bottom of my shoes when done. Had to scrape the stones off. |
Originally Posted by Marylander
(Post 21259100)
Ah, that is awesome news. When they did the work from brunswick heading north they did it in stages: first drag/clear a section, then put down a first layer of stone, then put down dust, before finally running the rollers on it. Even after they finish working on a section it takes a while to settle. I thought the new surface was ruined right away when it rained and then a bunch of horses used it. After a heavy rain later that week you couldn't tell the horses had been there (on a related topic I wish the horse riders would remove their manure from the path...). So, it was still pretty soft. Now that many months have passed it has gotten pretty solid. You can't tell when the rangers have driven their trucks through any more. Even so the people who ride their bicycles on it have their calves covered in grit after riding even on dry days. I suppose I'll know my own opinion on it for cycling once I get out there on a bicycle with some regularity (should be out there tomorrow). I do know that it's great for running as is.
|
A guy on a rail aficionado site posted this on YT. I snapshot some of the video of the sections showing how much damage was done to the walkway. It’s going to be a while to fix this.
https://cimg2.ibsrv.net/gimg/bikefor...e58b26eece.png https://cimg3.ibsrv.net/gimg/bikefor...da28ca7b9a.png https://cimg5.ibsrv.net/gimg/bikefor...ede1a54d28.png https://cimg7.ibsrv.net/gimg/bikefor...cf9e02e7eb.png |
An update on this train derailment, and reconditioning of the foot bridge:
https://www.winchesterstar.com/repor...7df18fa22.html It sounds like the train was stopped with the brakes on, and the engineer went "full speed ahead" at the engine, and pulled the line tight (as you might when pulling a curve out of a string) and it yanked the cars off the track. The news article claims the foot bridge is expected to be back in service in late July. |