Go Back  Bike Forums > Bike Forums > Touring
Reload this Page >

Upcoming Railroad Work Near the GAP Trail (

Search
Notices
Touring Have a dream to ride a bike across your state, across the country, or around the world? Self-contained or fully supported? Trade ideas, adventures, and more in our bicycle touring forum.

Upcoming Railroad Work Near the GAP Trail (

Thread Tools
 
Search this Thread
 
Old 04-06-11, 03:01 PM
  #1  
Senior Member
Thread Starter
 
Join Date: Nov 2010
Location: Along the Rivers of Pittsburgh
Posts: 1,255

Bikes: 2011 Novara Forza Hybrid, 2005 Trek 820, 1989 Cannondale SR500 Black Lightning, 1975 Mundo Cycles Caloi Racer

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 258 Post(s)
Liked 291 Times in 157 Posts
Upcoming Railroad Work Near the GAP Trail (

I don't think this has been posted yet, but there is some CSX railroad related work going to happen near the GAP trail near Confluence and the Pinkerton Tunnel area.

CSX runs the operating rail line that parallels the GAP Trail along much of the way. CSX is modernizing this line to accommodate doublestack container cars from the East Coast to Ohio. Primarily, this means ensuring that there is sufficient height along the length of the line. In order to do this, CSX is actually lowering the railbed in some places and while removing overhead obstacles in other places.

One area is the Blue Lick Truss (Keystone Viaduct) near Confluence. This bridge is going to be raised to achieve the required height for the track below. The website listed below indicates that bike trail will be open during the construction, noted to occur in Q3 and Q4 of 2011.

The CSX is "open-cutting" their railroad tunnel that pierces the Pinkerton Neck, meaning they are actually going to remove the overburden and the roof of the tunnel. This is very near, but separate from, the closed Pinkerton Tunnel on the GAP Trail. It appears that this will not impact the Trail itself, but you will find a lot of forest has been clear cut on Pinkerton Neck. According to the GAP Yahoo Groups, the overburden that will be removed by the clear cut will be placed on top of the Pinkerton Neck. I hope that the work doesn't negatively impact the Trail.

For details: CSX Railroad Work Near GAP Trail

Last edited by Altair 4; 04-07-11 at 07:50 AM. Reason: Geographical Clarity
Altair 4 is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
HardyWeinberg
Pacific Northwest
2
09-09-14 04:07 PM
El Cid
Eastern Canada
5
03-05-14 06:29 PM
Juan Foote
Southeast
0
01-06-13 05:35 PM
NE Tiger
Northeast
4
08-08-10 07:44 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.