Go Back  Bike Forums > Community Connections > Regional Discussions > Northeast
Reload this Page >

Belt Parkway bikeway update

Search
Notices
Northeast Connecticut | Maine | Massachusetts | New Hampshire | New Jersey | New York |Rhode Island | Vermont |

Belt Parkway bikeway update

Thread Tools
 
Search this Thread
 
Old 10-20-13, 02:49 AM
  #1  
Senior Member
Thread Starter
 
Join Date: Jul 2004
Location: Brooklyn NY
Posts: 7,728

Bikes: Kuota Kredo/Chorus, Trek 7000 commuter, Trek 8000 MTB and a few others

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 22 Post(s)
Liked 464 Times in 365 Posts
Belt Parkway bikeway update

I went onto the Belt Parkway bike lane to see if any progress was made at Plum Beach, and they are working on it. My mother, who happens to live in the building that overlooks the Belt, reported that trucks have been unloading boulders along the shore, and they actually have built a dune to protect the bikeway and highway along the exposed area. There are grasses planted along it also. The bikeway itself is still not built, but looks to have been cleared of sand in places. Maybe they'll be doing that soon.

In any case, you can walk it as it isn't that long. I was there on a Saturday, and I don't know if there is construction on weekdays. Plus the shutdown probably slowed them down as it is an NPS run facility.

I have some pictures on my iPad, but I don't have that with me at the moment. I'll post them later.
zacster is offline  
Old 10-20-13, 06:28 PM
  #2  
Senior Member
 
FattyArbuckle's Avatar
 
Join Date: Oct 2010
Location: Queens, NY
Posts: 78

Bikes: 2010 Specialized Allez

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Great news! This has been impassable (or, roughly passable) for what, four years now?
FattyArbuckle is offline  
Old 10-20-13, 06:56 PM
  #3  
Junior Member
 
Join Date: Feb 2013
Location: Brooklyn, NY
Posts: 155

Bikes: C'dale Quick 1

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Liked 26 Times in 7 Posts
As of a few weekends ago, there was only about a 100 foot stretch of sand you would have to walk through. Not so bad
anthonybkny is offline  
Old 02-12-15, 01:25 PM
  #4  
Senior Member
 
Join Date: Aug 2008
Posts: 4,440
Mentioned: 23 Post(s)
Tagged: 0 Thread(s)
Quoted: 863 Post(s)
Liked 234 Times in 136 Posts
I just drove the entire length of the Belt and I noticed a lot of road construction going on. Sorry to be a Johnny-Come-Lately here, but can somebody fill me in on what's happening? It looks like they are rebuilding entire sections of the roadway, further away from the water and at a higher elevation. Given recent storm damage, I'd imagine this is a smart idea. Most importantly (to me), is there a plan to move the bikeway onto the new road?

(Please don't link me to a useless NYSDOT web page, as I don't have patience for those, ever! I'd just like a quick overview, if anybody can provide one.)

Thanks!
Papa Tom is offline  
Old 02-24-15, 02:23 PM
  #5  
Senior Member
 
qclabrat's Avatar
 
Join Date: Dec 2007
Posts: 1,373
Mentioned: 4 Post(s)
Tagged: 0 Thread(s)
Quoted: 257 Post(s)
Liked 70 Times in 63 Posts
that may be the intent, but I thought they were trying to add a lane to improve traffic towards JFK

where's the construction, I usually turn off by Coney Island

Off of Verrazano most work is wrapping up


Originally Posted by Papa Tom
I just drove the entire length of the Belt and I noticed a lot of road construction going on. Sorry to be a Johnny-Come-Lately here, but can somebody fill me in on what's happening? It looks like they are rebuilding entire sections of the roadway, further away from the water and at a higher elevation. Given recent storm damage, I'd imagine this is a smart idea. Most importantly (to me), is there a plan to move the bikeway onto the new road?

(Please don't link me to a useless NYSDOT web page, as I don't have patience for those, ever! I'd just like a quick overview, if anybody can provide one.)

Thanks!
qclabrat is offline  
Old 02-25-15, 08:19 AM
  #6  
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,882

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3238 Post(s)
Liked 2,086 Times in 1,181 Posts
Sorry Tom, but the link provides more and better info then I have the time or patience to type. As well it's easy to read and is a complete description.

No additional (4th) lane. Just widening and road height improvements, breakdown lanes, new bridges, new bike path, etc...

Here's the original plan:

https://www.nyc.gov/html/dot/download...wybrgs_eng.pdf

It's mostly been/being followed, with the eastern sections of Fresh Creek, Rockaway and Paerdegat being competed for about a year now. The Mill Basin bridge, whose construction of approaches and bridge was supposed to start in 2013, has seen no progress as yet. I suspect they are going to substantially finish the Gerritsen bridge before moving to the Mill Basin, but have seen nothing in writing about that plan, nor have seen any updated information about the revised schedule.

I also think that the Gerritsen Inlet Bridge approaches from the west at Knapp Street, which is being built north of the current bridge, will re-align the bike path from its current proximity to the beach. Thus the construction to repair Sandy and prior damage west of Plumb Beach to near Knapp St, was delayed as they know it's all temporary till the new Gerritsan Bridge is completed.

Last edited by Steve B.; 02-25-15 at 02:43 PM.
Steve B. is offline  
Old 02-27-15, 07:31 AM
  #7  
Senior Member
Thread Starter
 
Join Date: Jul 2004
Location: Brooklyn NY
Posts: 7,728

Bikes: Kuota Kredo/Chorus, Trek 7000 commuter, Trek 8000 MTB and a few others

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 22 Post(s)
Liked 464 Times in 365 Posts
I saw they had started construction at Gerritsen at the end of last summer. It looked like they were building the new bridge just north of the existing one, maybe the westbound section is going up, then they'll build the new eastbound where the old westbound is. I haven't been back that way since, but it'll be one of my early rides once this cold weather breaks. I still can't understand though why they couldn't have put in a temporary bikeway in the washed out section for this many years even if they were planning to replace it. No roadway would have been left like that for so long. This was washed out even before Sandy. This is probably the busiest section of the bikeway/pedestrian path too.

Completion was 2016, so probably another year or two at least. Still plenty of time for them to temporarily fix the washed out section.
zacster is offline  
Old 02-27-15, 10:18 AM
  #8  
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,882

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3238 Post(s)
Liked 2,086 Times in 1,181 Posts
Originally Posted by zacster
I saw they had started construction at Gerritsen at the end of last summer. It looked like they were building the new bridge just north of the existing one, maybe the westbound section is going up, then they'll build the new eastbound where the old westbound is. I haven't been back that way since, but it'll be one of my early rides once this cold weather breaks. I still can't understand though why they couldn't have put in a temporary bikeway in the washed out section for this many years even if they were planning to replace it. No roadway would have been left like that for so long. This was washed out even before Sandy. This is probably the busiest section of the bikeway/pedestrian path too.

Completion was 2016, so probably another year or two at least. Still plenty of time for them to temporarily fix the washed out section.
The washed out section west of Plumb Beach parking lot was awaiting the Army Corp of Engineers to replenish the beach, so there would be something to actually place asphalt on top of.

I've no idea if the ACE ever accomplished replenishment, but apparently the city decided to fix the path anyway, at least as far as it's been repaired ( I haven't been there since last summer)

In any event, when they finish the new Gerritson bridges, portions of the Belt roadway will obviously be relocated onto the new bridges, with a new path on the south side of the eastbound bridge. Thus more construction to follow, but be aware that as per the contract (and as stated in link I provided), the contractors for this entire Belt renovation project, is required to maintain a complete and functional bike path during construction and have mostly followed that on the portions east of Flatbush.

Anybodies guess what will happen when they replace the Mill Basin drawbridge, though I'm assuming they will maintain existing while building new, which is also to be located on the north side of the existing.
Steve B. is offline  
Old 03-01-15, 07:31 PM
  #9  
Senior Member
 
Join Date: Apr 2014
Location: Queens
Posts: 335

Bikes: Canyon Aeroad, Parlee ESX, Factor o2,Colnago CX Zero Disc,

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 47 Post(s)
Liked 2 Times in 2 Posts
Originally Posted by Steve B.

Anybodies guess what will happen when they replace the Mill Basin drawbridge, though I'm assuming they will maintain existing while building new, which is also to be located on the north side of the existing.
they better keep that opened!
Billy1111 is offline  
Old 06-15-15, 07:04 PM
  #10  
Senior Member
Thread Starter
 
Join Date: Jul 2004
Location: Brooklyn NY
Posts: 7,728

Bikes: Kuota Kredo/Chorus, Trek 7000 commuter, Trek 8000 MTB and a few others

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 22 Post(s)
Liked 464 Times in 365 Posts
An update: I rode the Belt from Sheepshead Bay to Howard Beach on Sunday. The section at Plum Beach is now fully paved!!!!!! Construction of the new bridge at Gerritsen looks to be complete for westbound traffic but isn't open yet. It is unclear how they'll complete this project just by looking at it, whether they'll build a new eastbound where the westbound currently is. As long as they keep the current bridge up I don't really care, as bad as that bridge is. I didn't really see how they progressed on the other bridges as I don't come that way very often.

In any case, you can now ride the entire length without walking. Why it took 1 1/2 years from my original posting is beyond me. It wasn't a very long stretch at Plum Beach.
zacster is offline  
Old 06-16-15, 07:46 AM
  #11  
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,882

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3238 Post(s)
Liked 2,086 Times in 1,181 Posts
Originally Posted by zacster
An update: I rode the Belt from Sheepshead Bay to Howard Beach on Sunday. The section at Plum Beach is now fully paved!!!!!! Construction of the new bridge at Gerritsen looks to be complete for westbound traffic but isn't open yet. It is unclear how they'll complete this project just by looking at it, whether they'll build a new eastbound where the westbound currently is. As long as they keep the current bridge up I don't really care, as bad as that bridge is. I didn't really see how they progressed on the other bridges as I don't come that way very often.

In any case, you can now ride the entire length without walking. Why it took 1 1/2 years from my original posting is beyond me. It wasn't a very long stretch at Plum Beach.
The link in my post of 2/25 explains the process. The timeline is off as they were supposed to have started Mill Basin in 2013 and have not. I suspect the same contractor is doing Gerritsen and Mill Basin, just no longer concurrently.
Steve B. is offline  
Old 06-16-15, 04:13 PM
  #12  
aka Tom Reingold
 
noglider's Avatar
 
Join Date: Jan 2009
Location: New York, NY, and High Falls, NY, USA
Posts: 40,503

Bikes: 1962 Rudge Sports, 1971 Raleigh Super Course, 1971 Raleigh Pro Track, 1974 Raleigh International, 1975 Viscount Fixie, 1982 McLean, 1996 Lemond (Ti), 2002 Burley Zydeco tandem

Mentioned: 511 Post(s)
Tagged: 0 Thread(s)
Quoted: 7348 Post(s)
Liked 2,470 Times in 1,435 Posts
Public works projects take a frustrating amount of time. It sounds like things are looking up. Maybe I'll take a ride there this summer.
__________________
Tom Reingold, tom@noglider.com
New York City and High Falls, NY
Blogs: The Experienced Cyclist; noglider's ride blog

“When man invented the bicycle he reached the peak of his attainments.” — Elizabeth West, US author

Please email me rather than PM'ing me. Thanks.
noglider is offline  
Old 03-24-16, 08:32 PM
  #13  
Junior Member
 
lammius's Avatar
 
Join Date: Jan 2008
Location: Jersey City, NJ
Posts: 11

Bikes: Cannondale Synapse Carbon Ultegra Disc (2015); Priority EIGHT (2016)

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Has anyone been out in this area recently? I'm considering potential rides for this Sunday and curious about the status of the work in this area. I haven't ridden along the Belt since before Sandy. Actually I can tell you the last time was in 2012, the day the shuttle Enterprise was barged from JFK to NJ. I biked over to the Cross Bay Bridge to take pics.
lammius is offline  
Old 03-25-16, 07:28 AM
  #14  
Senior Member
 
Ferdinand NYC's Avatar
 
Join Date: Jul 2012
Location: New York City
Posts: 380

Bikes: Giant road bike

Mentioned: 6 Post(s)
Tagged: 0 Thread(s)
Quoted: 64 Post(s)
Liked 5 Times in 5 Posts
I was there several times last summer. While the section between Flatbush Avenue and Knapp Street remained sand-covered for more than a year after the hurricane, it was just fine by last summer.
Ferdinand NYC is offline  
Old 03-27-16, 08:20 AM
  #15  
Senior Member
Thread Starter
 
Join Date: Jul 2004
Location: Brooklyn NY
Posts: 7,728

Bikes: Kuota Kredo/Chorus, Trek 7000 commuter, Trek 8000 MTB and a few others

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 22 Post(s)
Liked 464 Times in 365 Posts
There's a lot of construction along the Belt right now, but they are supposed to be maintaining the bike path as they work. As far as I have seen, the old bridges are still in place but maybe the bike lanes have been shifted over on the approaches to allow them to shift the traffic lanes over as well. I was driving so I couldn't look too closely.
zacster is offline  
Old 03-27-16, 08:44 AM
  #16  
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,882

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3238 Post(s)
Liked 2,086 Times in 1,181 Posts
Originally Posted by zacster
There's a lot of construction along the Belt right now, but they are supposed to be maintaining the bike path as they work. As far as I have seen, the old bridges are still in place but maybe the bike lanes have been shifted over on the approaches to allow them to shift the traffic lanes over as well. I was driving so I couldn't look too closely.
The Mill Basin basin bridge, east of Flatbush, is still used for vehicle traffic as well as the very narrow bike lane. They have indeed maintained the bike path from Flatbush east, rebuilding and laying down asphalt as needed to maintain the path thru this convoluted construction zone.

They won't move the path over Plum Creek (west of Flatbush) to a new bridge till the 2nd and eastbound traffic bridge gets built. Might have happened already, but I will try to drive past there today on the way to work.
Steve B. is offline  
Old 03-27-16, 10:22 PM
  #17  
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,882

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3238 Post(s)
Liked 2,086 Times in 1,181 Posts
Yes, the path is open from Knapp St. east to Howard Beach

The path at the Plumb Beach/Gerritsan Creek bridge is still on the original bridge. The eastbound bridge is a few weeks or months from completion, as far as I can tell.
Steve B. is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Solid_Spoke
Road Cycling
13
01-23-14 11:53 AM
lee_rimar
Folding Bikes
12
11-10-10 11:13 AM
billm45s
Northeast
4
03-17-10 09:41 AM
tatfiend
Bicycle Mechanics
36
02-27-10 12:17 PM
Lightingguy
Northeast
3
12-16-09 09:22 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.