SART closed for 18 months between 91 and Lakeview. Anybody know why?
#1
Senior Member
Thread Starter
Join Date: Jul 2010
Location: Orange, CA
Posts: 2,201
Bikes: Roubaix / Shiv
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 12 Post(s)
Likes: 0
Liked 2 Times
in
1 Post
SART closed for 18 months between 91 and Lakeview. Anybody know why?
As the title says, I saw the signs today saying a mile of the SART is closed for a year and a half, until Oct 1st, 2015. The trail was still open and I saw nothing suggesting what was happening, but all the detour signs are already up to lead you off the SART and onto the road for a mile or so.
18 months seems like a long time to shut it down.
18 months seems like a long time to shut it down.
#2
SuperGimp
What do you think the detour will be? Riverdale?
That's a long time but it's still less than they've shut down Coyote Creek. I believe it took them less time to redo the underpasses on SGRT in a few places but that was also shut down for what felt like forever.
I normally get on the path at Tustin when I ride from home, I hope that's still feasible.
That's a long time but it's still less than they've shut down Coyote Creek. I believe it took them less time to redo the underpasses on SGRT in a few places but that was also shut down for what felt like forever.
I normally get on the path at Tustin when I ride from home, I hope that's still feasible.
#3
Junior Member
Join Date: Apr 2013
Location: Torrance, CA
Posts: 13
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
What do you think the detour will be? Riverdale?
That's a long time but it's still less than they've shut down Coyote Creek. I believe it took them less time to redo the underpasses on SGRT in a few places but that was also shut down for what felt like forever.
I normally get on the path at Tustin when I ride from home, I hope that's still feasible.
That's a long time but it's still less than they've shut down Coyote Creek. I believe it took them less time to redo the underpasses on SGRT in a few places but that was also shut down for what felt like forever.
I normally get on the path at Tustin when I ride from home, I hope that's still feasible.
It looks like the closure is part of the improvements to SR-91.
#4
SuperGimp
Is the blocked off part between Warner and McFadden the part that was supposed to be completed by January 2014 or something? It's sporadically blocked off.
Welcome to BikeForums by the way.
Welcome to BikeForums by the way.
#5
Junior Member
Join Date: Apr 2013
Location: Torrance, CA
Posts: 13
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
I've just lurked around here for almost a year after making an account, but I finally had something especially relevant to post about! Thanks for the welcome.
I do remember that first section being closed in the past with the same detour route, and also remember it reopening. There's only the Edinger overpass in that section so maybe they're working on it again.
I do remember that first section being closed in the past with the same detour route, and also remember it reopening. There's only the Edinger overpass in that section so maybe they're working on it again.
#6
Senior Member
Thread Starter
Join Date: Jul 2010
Location: Orange, CA
Posts: 2,201
Bikes: Roubaix / Shiv
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 12 Post(s)
Likes: 0
Liked 2 Times
in
1 Post
Yes, welcome Selicate, and thanks for the info. It does seem to be all about the 91 expansion.
TrojanHorse, i took the detour on my way out to Corona, so you can see where it starts and ends here:
Bike Ride Profile | 26 miles near Orange | Times and Records | Strava
TrojanHorse, i took the detour on my way out to Corona, so you can see where it starts and ends here:
Bike Ride Profile | 26 miles near Orange | Times and Records | Strava
#7
Senior Member
Join Date: Aug 2011
Location: Fullerton
Posts: 370
Bikes: Baum Corretto - Felt F1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
If it is the same crew that is doing the underpass on Kramer I'd say the work will be done in 5 years or so. That project is so slow it has to be a "by the hour" job
#8
Junior Member
Join Date: Dec 2012
Location: Woodland Hills
Posts: 6
Bikes: 2012 Catrike 700
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
So, according to the original announcement this work should be finished by now and the trail open. Anyone know what the current status actually is? Can't seem to find anything about it online.
#9
Junior Member
Join Date: Sep 2013
Location: Upland
Posts: 7
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Have ridden SART in the last few weeks, work has been completed, so no detours. Jim