View Single Post
Old 11-07-10 | 03:22 PM
  #44  
augustgarage's Avatar
augustgarage
Lurker
 
Joined: Aug 2009
Posts: 309
Likes: 0
From: North Hollywood
Date of Ride: 11/6/2010
Type of Ride: Group Ride (done mostly solo)
Name of organized ride or route: Malibu Coastal Cruise 200K (PCH Randonneurs)
Actual Mileage: 128
Ride Time: ~7:05
Total Time: 7:45
Avg. Speed: ?
Altitude Climbed: ~1500ft
Weather conditions: Overcast, low 70s, light tailwind on the way North, light headwind on the way South.
Synopsis of Ride: From Malibu to Carpinteria and back along the coast. A gorgeous day, and something of a hammer-fest for me as I was determined to break 8 hours. I biked 34 miles to the start over Topanga Canyon, but I didn't count that in the above totals. Ride report is here.

Last edited by augustgarage; 11-08-10 at 09:42 AM.
augustgarage is offline  
Reply