View Single Post
Old 04-12-11 | 08:37 PM
  #9  
chinarider's Avatar
chinarider
Dan J
 
Joined: Jul 2006
Posts: 1,244
Likes: 0
From: Iron Mountain, MI

Bikes: 1974 Stella 10 speed, 2006 Trek Pilot 1.2

Must be the martini. As Brian said, the training methods that use HRR, use RHR plus % of HRR. So using your numbers, if the training method says 75% of HRR reserve, the formula is 70 + (120 x 75%) or 70 + 90 =160.
chinarider is offline  
Reply