Originally Posted by Helmet Head
warrants $1.5M to solve it.
Here is a $2M project that is 3/4mi (but much more than BLs)
http://www.tempe.gov/tim/13thStreet.htm
Here is a $3M project (with before and after pictures you will love):
http://www.tempe.gov/tim/5thStreet.htm
Obviously the reason for these above projects was traffic volume that could not be supported by a 25mph residential street, but BLs/bicycle friendly were factors as well.
Al