View Single Post
Old 05-12-14 | 10:26 AM
  #41  
Steve B.
Senior Member
15 Anniversary
Community Builder
 
Joined: Jul 2007
Posts: 8,576
Likes: 3,509
From: South shore, L.I., NY

Bikes: Trek Emonda SL7, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Originally Posted by Papa Tom
May 11, 2014

Rode down to the beach today hoping that they may have opened the extension to TOBAY in time for Mother's Day. As shown in the attached photo, it still looks a few weeks away from completion. Good ride anyway, though my legs and lungs are still way out of shape from such a dormant winter.

Has anybody seen the new bronze statue near the entrance to the bikeway in Cedar Creek Park? It's in memory of "Matt Scarpa," who I think may have been the cyclist killed by an out-of-control car on the bikeway a few years back. If I am correct, he's directly responsible for the new safety rails all along the bikeway.

All correct, that is indeed the statue to Matt. It's a terrific memorial, IMO.

I suspect that as they did with the BP extension, they will not lay down the last 100 yards of asphalt at the start in JB, until the *entire* path is completed, guardrails, signage, etc..... They did this at BP, leaving a rough surface for a bit, as well as a lot of orange netting.

As BTW, have you (Tom) ridden the BP extension and have they yet finished the curb cuts at Washington, Old Country or Suunyside ?
Steve B. is offline  
Reply