A neat hack to get the rigidity would be to have the slats connected by a cable that can be tensioned with some kind of knob so that they will become rigid upon tensioning. When you're done, release the tension and roll back up. Two cables would probably do the trick, especially if you set up the slats in a tongue and groove configuration.