View Single Post
Old 10-13-14 | 10:06 PM
  #10  
jayd2
Junior Member
 
Joined: Jul 2012
Posts: 10
Likes: 0
Here's the frame before and after the stretch. The top tube was stretched 5.5", the splice has a custom made tube inserted inside that extends past the each end of the 5.5" section by 2" and there are 8 plug welds. The lower top tube is a new section that's brazed in place.

Attached Images
File Type: jpg
FrameStretch.jpg (205.8 KB, 42 views)
File Type: jpg
FrameJig.jpg (212.1 KB, 44 views)
File Type: jpg
FrameStretch_Engine.jpg (212.5 KB, 27 views)

Last edited by jayd2; 10-15-14 at 12:12 PM.
jayd2 is offline  
Reply