Originally Posted by
FBinNY
According to the report, the train was delayed by 40 minutes as a result of the accident. I don't get it, why?. How could the engineer have any idea that a bicycle hit his train broadside?
I'm guessing a passenger saw it and reported it. Or maybe a driver saw it happen and called the "Polish 911"