The Schwinn Target bike transformation is making progress.
Handle bars will be in Wednesday that's another 1/2 pound and I'm still waiting for several Ti bolt kits to total over 40 bolts that will go from SS to Ti.
It's pouring rain so I could only test ride and carbon dose smooth out the ride.
The shop removed some off the seat post it was still very long now it is about right.
I'm not sure this scale is right but it is possible.
Last edited by goraman; 04-09-16 at 03:04 PM.