Originally Posted by
chong67
Thanks. Mine says 11/27/2015 on the toptube
My LBS says its a 2017 bike. They had to order it and took a week.
Whats the course of action?
You do realize that frames are made year round at the factory don't you? Then there is assemble that has to be done, boxed, loaded in a cargo container, shipped across seas, unloaded from ship, go through customs, loaded on truck, shipped to wharehouse, and loaded and stored again. Then enough of the new model bikes have to be accumulated so as to meet immediate demand.