Old 09-20-16 | 11:40 AM
  #21  
jefnvk's Avatar
jefnvk
Senior Member
 
Joined: Apr 2015
Posts: 8,206
Likes: 86
From: Metro Detroit/AA

Bikes: 2016 Novara Mazama

Originally Posted by DropBarFan
Surly AFAIK no longer makes an S&S Trucker & Ritchey's page doesn't include the Tourer. Couplers can save a lot of money in air/taxi fees but they're a lot of work, generally at least 1 hr each for disassembly/reassembly.
How long does disassembly/packing/reassembly take with a normal bike for others? After having done it a couple times, I could probably break an hour per bike now (less for reassembly), but I don't see significantly improving the disassemble/pack side of things.
jefnvk is offline  
Reply