
One of the 1st things I did in regards to building the tandem was to contact Tim at Lightning Dymanics and provided him with my design for a right side drive system. They did a great job in manufacturing the parts and tolerances need.
https://imgur.com/a/oa12g
Last edited by Bad1; 04-14-17 at 02:15 PM.
Reason: Add photos