
So after the plans were agreed upon and signed off, Filament got busy and built the frame, as shown the tubes have been cut and assembled, pictures show the fillet work that had been done for smooth transition between tubes, and the pre peg wrap after coming out of the oven which cures all joints and gives strength to the frame. Very happy with the frame weight at that point!
https://imgur.com/a/yq6zG