Thread: Ms 150
View Single Post
Old 10-28-17 | 07:17 PM
  #544  
Tanstaafl
Senior Member
10 Anniversary
 
Joined: Jan 2013
Posts: 162
Likes: 31
From: Houston, TX

Bikes: Specialized Crosstrails

Originally Posted by faulker479
It was my understanding that the finish was changed because the parking lots, where all the booths were setup, were going to become either buildings or parking garages.
That is exactly right. Buildings are going up where the finish line tents used to be. If they had kept to their original schedule, the MS150 would have finished elsewhere in 2017. Another factor is Rick Perry is no longer in office. He was a big fan of the MS150, and that brought the ride a lot of pull in keeping the downtown finish.
Tanstaafl is offline  
Reply