View Single Post
Old 07-16-18 | 09:33 AM
  #54  
u235's Avatar
u235
Senior Member
 
Joined: Mar 2017
Posts: 1,185
Likes: 133
Originally Posted by alan s


See if you can get CSX to bring in a temporary bridge for the towpath over the culvert. Good PR and all. And it will keep the scofflaws off the tracks.
Must be something else going on at that specific spot. Assume they need additional engineering. NPS quickly put temp bridges and did cleanup, grading, and leveling further up north and south of Williamsport. Based on the tracks from the equpment and amount of soft soil and storm debris in those areas the did fix, it was major work. Maybe that blew up the NPS C&O budget.

Last edited by u235; 07-16-18 at 09:39 AM.
u235 is offline  
Reply