Originally Posted by
alan s
See if you can get CSX to bring in a temporary bridge for the towpath over the culvert. Good
PR and all. And it will keep the scofflaws off the tracks.
Must be something else going on at that specific spot. Assume they need additional engineering. NPS quickly put temp bridges and did cleanup, grading, and leveling further up north and south of Williamsport. Based on the tracks from the equpment and amount of soft soil and storm debris in those areas the did fix, it was major work. Maybe that blew up the NPS C&O budget.