My bike is also scheduled for July. Kinda wish I took on the risk of a backer position for the earlier ship date, upgraded components and lower price because I really wanted to ride it this Spring, but I'm still excited that I'll be getting my bike finally (let's assume it actually arrives this year) and it will be fun watching the backer reviews start to appear before then. At least I can get a refund if it turns out to be crap, but I don't think it will
I sincerely hope the July date doesn't slip to a later month, as pretty much every other announced date has. I was originally told the insanely optimistic shipping date of July 2017