Originally Posted by
AvnerBen
The formal forecast was 100 pieces a month to start with, reaching 250 in spring. By this rate, my August delivery estimate was realistic. If we are down to two-digit month rate, then it's 2020.
I sincerely hope this is a temporary setback!
Yes, I do hope that production ramps up substantially. I just started a REVIEW thread for actual owners of Helix that received the bike in this forum and will be adding to it including tips/tricks. I would love to hear more feedback/observations from Helix riders. So far, I've been very impressed with.