That sounds much better, but Peter should really stop making time estimates and promising updates at certain times or intervals, because somehow he is almost always late
Anyway, 4 bikes a day ~= 300 days until they reach my bike
I hope there are still gains to be made in the production speed, and I hope they mean 4 bikes a day average over 7 day week, not a 4 bikes per work day. That's probably hoping for too much, though :/
If they can maintain that rate, I should get mine by June 1, 2020.
I can live with that.
(Latest update is 65 biked shipped. I'm
#1405 . [1405-65]/4=335 days)