View Single Post
Old 09-06-19 | 08:17 AM
  #14  
steve392
Junior Member
 
Joined: Aug 2019
Posts: 17
Likes: 3
Was coming back from NYC last night and took upper level. All structural steel for the new ramps are in and looks like concrete has been poured for the entire length. New ramp leading to original bridge sidewalk is poured on north side. No idea on whether the new pathway on the actual bridge has been started or poured. Couldn't see it.
steve392 is offline  
Reply