Look up wire splicing not patching. Use the same or bigger gauge wire on the extension. Also look into "heat shrink tubing" as a outer covering for sealing and protection.
Think about where and how you'll run the longer wire to have the least amount of movement when turning BEFORE you decide how much wire you need to add.