View Single Post
Old 07-13-20, 12:43 PM
  #5  
frogman
Senior Member
 
frogman's Avatar
 
Join Date: Sep 2006
Location: Napa Valley, CA
Posts: 908

Bikes: Wife says I have too many :-)

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 327 Post(s)
Liked 250 Times in 158 Posts
Originally Posted by Leinster
Something like this? I can see it working...


Just had a look at my Strava from my ride down there; there's an incomplete, 1/2 mile extension to Devlin that takes you within what must only be a couple hundred yards of the back of the Biagi warehouse. And south of the end of that extension, they're building a bridge over the creek; the concrete deck is poured, and it just needs the roadway to connect to it. I'd be pretty sure looking at what they've got going there that a connection from Devlin to Green Island Rd can't be far off, and at that stage it'll be really close to feasible to bike all the way from Napa to Vallejo without going onto the highway.

I like the train track cycle rig 😆. I’m going to check out the roadwork around Biagi. Sounds interesting and promising !!
frogman is offline