Thread: Addiction LXXX
View Single Post
Old 10-09-20, 03:06 PM
  #865  
phrantic09
Fat n slow
 
Join Date: Oct 2013
Location: Saratoga, NY
Posts: 4,312

Bikes: Cervelo R3, Giant Revolt

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 3263 Post(s)
Liked 2,088 Times in 982 Posts
Originally Posted by LesterOfPuppets
Once a year or so, take a nice flat blade spade and dig out a wedge 1-1.5" wide at the top all along the sidewalks/driveways. It's a lot of work initially but if you're doing weekly line-trimming it's a lot easier when there's a gap. Probably not good in frequent freeze areas, as water is more likely to get under the concrete, freeze, then heave.
i use an edger every 2-3 weeks
phrantic09 is offline