I just ordered one from HPM. Either Jan, or his frame builder Mac or both will make your swift to order. It takes about 3 months to get one built. They hand cut and build each frame to order here in the US. I think that Peter only sells the same aluminum frames the xootr sells now. If you buy directly from Peter instead of xootr, you can have it custom built with your choice of components and color of powder coating.
I ordered a steel swift from HPM, because I like the fact that it is being fabricated and built to order in a 2-3 man shop here in the U.S.. I prefer steel to aluminum, and I also like that Jan developed and built the swift with Peter. Mac was already working on a swift frame when I called, so my wait time should be about a month(hopefully less).